Flow Meter & Rain Gauge Replacement

Open State & local contract opportunity Posted

Solicitation number
2025B-19
State
Connecticut
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Connecticut Department of Energy and Environmental Protection (or the issuing authority for Hartford County water/wastewater) is requesting bids for the removal and replacement of twelve flow meters and control systems, seven rain gauges and control systems, and three combined sewer overflow level sensors across Hartford, Newington, Bloomfield, West Hartford, and Wethersfield, with proposals due November 5, 2026.

The scope includes all labor, equipment, permits, and related costs for meter and gauge removal and installation, along with technical support and accessories. Three of the twelve flow meter installations will also require CSO level sensor removal and installation. Work is distributed across five municipalities in Hartford County, Connecticut.

Detailed specifications, labor requirements, equipment standards, and permitting obligations are contained in Section 01010 Summary of Work and throughout the bidding documents. Questions due, pre-bid meeting or site visit dates, evaluation criteria, contract term, and estimated value are not specified in the available summary material — bidders should reference the complete bidding documents (1. 2025B-19 Flow Meter and Rain Gauge Replacement.pdf, 25MB) for full procurement timeline and contract terms.

Opportunity text

The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the removal and replacement of twelve (12) flow meters and control systems, three (3) of which will also require the removal and installation of combined sewer overflow level sensors, and the removal and installation of seven (7) rain gauges and control systems along with technical support, support equipment, and accessories as shown and specified. Bidders are directed to Section 01010 Summary of Work for specific details. The Work shall be located in the City/Town of Hartford, Newington, Bloomfield, West Hartford, and Weathersfield; in the State of Connecticut as shown on the Bidding Documents.

Files

File Type Posted
1. 2025B-19 Flow Meter and Rain Gauge Replacement.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity