Fire Station No. 2 Door Replacement (rebid)

Closed State & local contract opportunity Posted

Solicitation number
ITB 26-089
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of College Station is requesting bids for complete bay door replacement at Fire Station No. 2, with bids due August 13, 2026. This is a rebid; the initial solicitation did not result in contract award.

The scope encompasses removal and lawful disposal of four existing apparatus-bay roll-up overhead doors, operators, trim, and related controls, and procurement and installation of four Door Engineering FF30 Performance Series high-speed, four-fold door systems. The awardee must supply all labor, materials, equipment, matching panels, surface-mounted frames, operators, control units, safety seals, and weather seals. Deliverables include full electrical wiring coordination, comprehensive system testing, and operational training for fire department personnel.

No set-asides, preferences, eligible-vendor restrictions, specific evaluation criteria, contract value, contract term, or procurement timeline details beyond the August 13 bid deadline are provided in the source material.

Opportunity text

The City of College Station invites qualified contractors to submit bids for the complete bay door replacement at College Station Fire Station No. 2. The selected contractor shall furnish all labor, materials, equipment, and services required to remove and lawfully dispose of four existing apparatus-bay roll-up overhead doors, operators, trim, and related controls as indicated on the Drawings. In addition, the contractor is responsible for the procurement and installation of four high-speed, four-fold Door Engineering FF30 Performance Series door systems. This installation must encompass all matching panels, surface-mounted frames, operators, control units, safety, and weather seals. Final deliverables include full electrical wiring coordination, comprehensive system testing, and operational training for fire department personnel.

Files

File Type Posted
Fire Station No. 2 Door Replacement (rebid).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity