Extension of Constitution Boulevard West - Phase 2

Closed State & local contract opportunity Posted

Solicitation number
BID #2026-31
State
Connecticut
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Shelton, Connecticut is requesting competitive bids for road construction services to extend Constitution Boulevard West–Phase 2 from Station 24+00 to Station 39+50 (1,550 feet), with proposals due July 31, 2026 at 11:00 a.m.

The scope encompasses excavation (approximately 9,000 cubic yards), utility installation including 1,600 linear feet of 12-inch ductile iron water main and 1,500 linear feet of 12-inch ductile iron sanitary sewer, electrical conduit, drainage infrastructure, asphalt paving, concrete work, erosion control, landscaping, traffic control, and staking across 92 line items with unit prices and estimated quantities. Phase 1 work on Bridgeport Avenue and Constitution Boulevard West (1,400 feet from Station 10+00 to Station 24+00) may be performed simultaneously. The contract duration is 360 calendar days from Notice to Proceed.

Award will be made to the lowest responsive and responsible bidder based on unit pricing for selected items implemented according to available funding. Bidders must submit a 5 percent bid deposit via surety bond and comply with Connecticut prevailing wage requirements as determined by the State Labor Commissioner. The successful contractor must furnish 100 percent performance and payment bonds within 15 days of award, maintain one-year warranty on all materials and equipment from substantial completion, and carry comprehensive general liability, automobile liability, and workers' compensation insurance with minimum limits of $1,000,000 to $2,000,000 depending on coverage type. Liquidated damages are assessed at $1,500 per calendar day for delays beyond contract completion. All work is subject to Connecticut prevailing wage laws and OSHA safety regulations.

Questions are due July 21, 2026 at 5:00 p.m., with responses provided by July 24, 2026. No pre-bid meeting is scheduled. If the project receives state funding, CHRO (Connecticut Historical Resources Organization) compliance may require re-bidding. The City is exempt from Connecticut sales and use taxes on incorporated materials and equipment.

Opportunity text

The City of Shelton is soliciting competitive bids from qualified firms for road construction services, road construction and expansion. The initial project, called Phase I, is comprised of the proposed improvements to Bridgeport Avenue and the Extension of Constitution Boulevard West from Bridgeport Avenue (Station 10+00 +/-) up to and just into the Mas Property (Station 24+00) for a length of 1,400 feet. The construction of this work might be performed simultaneously to the Phase 2 work. Phase 2 will extend the proposed work from the eastern end of the Mass Property (Station 24+00) to the western end (Station 39+50) for the additional length of 1,550 feet.

Files

File Type Posted
Extension_of_Constitution_Blvd_West_-_Phase_2.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity