Environmental Byproducts Compliance Support and Consulting Services
Closed State & local contract opportunity
- Solicitation number
- 142214078
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
Updated .
About this opportunity
JEA (Jacksonville Electric Authority) is soliciting proposals for environmental consulting services supporting byproduct and solid waste management at the Northside Generating Station and the former St. John's River Power Park, with responses due October 6, 2026, and a mandatory pre-response meeting on September 8, 2026 at 11:00 AM via Microsoft Teams.
Minimum qualifications require successful completion of at least two similar projects within the past five years involving environmental professional services for byproducts from circulating fluidized bed power generation facilities. JEA encourages but does not require subcontracting with Jacksonville Small and Emerging Business (JSEB) certified firms; JSEB participation is an evaluation criterion worth 10 points.
The scope encompasses design of environmental and material characteristics testing programs; regulatory agency correspondence; preparation of Conceptual Site Models, Site Assessment Work Plans, Site Assessment Reports, and Remediation Plans per Florida Administrative Code Chapter 62-780; soil, groundwater, sediment, surface water, and air investigations; treatability study plans and pilot study work plans; fugitive dust characterization studies; groundwater monitoring well design, installation, redevelopment, and sampling; haul road stormwater management plan design; pond liner repair planning and documentation; and technical reports per Florida Administrative Code Chapters 62-701 and 62-17 and the Florida Electrical Power Plant Siting Act. All raw data, aerial photographs, and collected information shall be processed and delivered to JEA in engineered products meeting these specifications.
The initial contract term is three years with two optional one-year renewal periods at JEA's discretion. Pricing is negotiated under the Consultants' Competitive Negotiation Act (Florida Statute Section 287.055); the first year is firm fixed, with potential CPI adjustments thereafter capped at 3% annually. JEA reserves the right to award one or multiple contracts. Evaluation criteria are professional staff experience (25 points), design approach and workplan (20 points), company experience (35 points), project manager proximity to Jacksonville (10 points), and JSEB participation (10 points). Required insurance includes commercial general liability ($1 million each occurrence, $2 million annual aggregate), professional liability ($1 million each claim, $2 million aggregate), and excess liability ($1 million).
Opportunity text
JEA is soliciting proposals for professional services from environmental consulting companies to provide environmental support services associated with byproduct and solid waste management generated from circulating fluidized bed and other turbine power generation facilities at the Northside Generating Station (NGS) and the former St. John's River Power Park (SJRPP). These services require a combination of technical expertise and an extensive understanding of applicable regulatory requirements. The scope of services will be determined based on need and generally consist of the following: • Design environmental and material characteristics testing program.• Meet and correspond with environmental regulatory agencies on behalf of JEA.• Prepare Conceptual Site Models, Site Assessment Work Plans, Site Assessment Reports and Remediation Plans per Florida Administrative Code Chapter 62-780.• Conduct soil, groundwater, sediment, surface water, and air investigations.• Prepare treatability study plans and conduct treatability studies.• Prepare and implement Pilot Study Work Plans.• Design and conduct study of environmental characteristics of fugitive dust from roadway construction materials.• Groundwater monitoring well design, installation, redevelopment, surveying, and sampling.• Design haul road stormwater management plans • Pond liner repair planning, documentation, and reporting.• Prepare Technical Reports per the requirements of Florida Administrative Code Chapter 62-701, Solid Waste Management Facilities.• Prepare Technical Reports pursuant to the Florida Electrical Power Plant Siting Act (PPSA), Sections 403.501-.518 of the Florida Statutes and Chapter 62-17 of Florida Administrative Code. The raw data, aerial photographs, and other collected information shall be processed with final information and engineered products delivered to JEA in accordance with these specifications. Mandatory Pre-Response Meeting: September 08, 2026, at 11:00 AM Response Due Date: October 6, 2026
Files
| File | Type | Posted |
|---|---|---|
| 1412214078 Solicitation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity