DSWWTP Lift Station Rehab WW2103B
Closed State & local contract opportunity Posted
- Solicitation number
- 26-042
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of League City, Texas is requesting sealed bids for rehabilitation of the Dallas Salmon Wastewater Treatment Plant Influent Lift Station (Bid No. 26-042), with bids due September 23, 2026 at 2:00 p.m. and a pre-bid conference and site visit on September 8, 2026 at 2:00 p.m. at the Johnnie Arolfo Civic Center.
The scope encompasses bypass pumping system installation with SCADA integration, removal and reinstallation of submersible pumps, blast cleaning and pressure washing of wet wells, dewatering and inspection of pump base elbows, reinforcing steel installation and concrete wall repairs, H2S corrosion-prevention coating, new flood-resistant access hatches and raised vent assemblies compliant with 500-year flood plain standards, new 316L stainless steel piping with guide rails and support brackets, gusset plates and tie rods on pump riser couplings and 30-inch force main headers, blasting and painting of above-ground piping and structural components with stencil labeling, and new level instrumentation with electrical and instrumentation work. The general contractor must perform a minimum of 40 percent of overall contract value.
Bid security equal to 5% of maximum bid price is required; performance, payment, and one-year maintenance bonds equal to 100% of total contract price must be furnished by a surety with a minimum Best Key Rating of "B" or SBA eligibility. Substantial completion and final completion timelines are bidder-proposed (with 30 days fixed for final completion thereafter). The contract includes a $100,000 miscellaneous construction contingency as a base bid item and additional extra work line items.
Evaluation considers project experience, key subcontractor qualifications, equipment resources, and financial ability. Bidders must submit 12-month financial statements, a statement of qualifications with minimum 10 project references, and a list of subcontractors and major suppliers with identification of local suppliers in Galveston County. A responsible local representative must be identified for the work period. Questions are due by 5:00 p.m. Monday, September 14, 2026. The City reserves the right to reject any or all bids and waive irregularities. Bid deposits for the three lowest bidders are returned within 7 working days after contract execution and bond approval; all others within 10 calendar days of opening.
Opportunity text
The project consists of the following scope of work: Installation of bypass pumping systems as required on the influent gravity raw sewage collection sewers. Connection to existing SCADA system for temporary equipment notification. Removal of existing submersible pumps and proper storage. Reinstall submersible pumps and connect electrical cables upon completion of rehabilitation work. Blast cleaning and pressure wash cleaning of all wet wells in preparation for structural repair methods. Dewatering and drying of existing wet wells. Inspect existing pump base elbows. Installation of additional reinforcing steel and buildup of lower concrete walls. Repair of upper concrete walls and roof ceiling surface. Installation of a coating system to prevent future H2S corrosion reactions. Installation of new flood resistant access hatches at the JB and ILS. Also install new vent assemblies raised to be protected from the current 500-year flood plain. Installation of new wet well type 316L stainless steel piping, guide rails, guide rail support brackets, new engineered pipe supports, etc. Installation of new gusset plates and tie rods on all pump riser piping couplings and on the 30-inch force main header; 3 places. Blast and paint all above ground piping and valves and paint with stencil label. Existing monorail structural support and beams to be blasted and repainted. New level instrumentation and water proofing details with all associated electrical and instrumentation work.
Files
| File | Type | Posted |
|---|---|---|
| 24-042 DSWWTP Lift Station Rehab WW2103B Project Manual to post.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity