Doansburg Road Bridge Repairs
Closed State & local contract opportunity Posted
- Solicitation number
- RFB-26-26
- State
- New York
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Alexis Hawley alexis.hawley@putnamcountyny.gov (845) 808-1088
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The State of New York is requesting bids for repair and rehabilitation of the Doansburg Road Bridge (BIN 3345500) over the East Branch Croton River in the Town of Southeast, Putnam County, with bids due August 12, 2026.
The scope comprises replacement of ten existing bridge bearings, installation of steel bearing stiffeners and associated structural steel repairs, replacement of deck expansion joints, and localized cleaning and painting of structural steel in repair areas. Temporary maintenance and protection of traffic must be implemented. All materials, workmanship, testing, and measurement must conform to the latest edition of the New York State Department of Transportation Standard Specifications, including all current official amendments, Engineering Instructions, Standard Sheets, and Bridge Manual requirements. Traffic control must comply with the New York State Manual of Uniform Traffic Control Devices and applicable NYSDOT Work Zone Traffic Control requirements.
The source does not identify estimated contract value, contract term, incumbent contractor, evaluation criteria, set-asides or preference programs, pre-bid or site-visit dates, or a question-due deadline. Prospective bidders should obtain the complete bid notice and contract documents for pricing terms, detailed submission requirements, and full project timeline.
Opportunity text
The work consists of the repair and rehabilitation of the existing bridge carrying Doansburg Road (BIN 3345500) over the East Branch Croton River in the Town of Southeast, Putnam County, New York. The project generally includes replacement of ten (10) existing bridge bearings, installation of steel bearing stiffeners and associated structural steel repairs, replacement of deck expansion joints, localized cleaning and painting of structural steel in the repair areas, and implementation of temporary maintenance and protection of traffic. The plans include the locations and details necessary to complete the repairs while maintaining the structural integrity and serviceability of the bridge. Unless specifically modified by these Contract Documents, all materials, workmanship, testing, measurement, and payment shall conform to the latest edition of the New York State Department of Transportation (NYSDOT) Standard Specifications, including all current official amendments, Engineering Instructions (EIs), Standard Sheets, Bridge Manual requirements, and applicable Special Specifications. Traffic control shall be performed in accordance with the New York State Manual of Uniform Traffic Control Devices (MUTCD) and applicable NYSDOT Work Zone Traffic Control requirements
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity