Design Services for Partial Roof Replacement - Knightdale High School
Closed State & local contract opportunity Posted
- Solicitation number
- RFQ-26-E-LC
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Tim Muller tjmuller@wcpss.net (919) 291-6593
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Wake County Public School System (WCPSS) is requesting qualifications for design services on a partial roof replacement project at Knightdale High School, with Statements of Qualifications due September 30, 2026 at 12:00 p.m. to tjmuller@wcpss.net.
The scope covers design for replacement of the existing 2-ply modified bitumen roofing system on roof areas A1 and A12 (approximately 36,718 total square feet) with a new 2-ply modified bitumen system, thermal roof insulation replacement with coverboard, and new sheet metal coping. The design firm must provide turnkey services including permit applications as required, bidding assistance, construction administration with scheduling coordination, pre-bid and preconstruction meetings, regular site construction meetings during construction, and project closeout. The firm must identify additional items of concern during an initial site visit and address them as part of the design scope.
The selected firm must maintain a minimum of $1,000,000 in professional liability insurance. Design fee negotiations are anticipated to begin immediately following selection, with a design notice to proceed targeted for November 4, 2026. Selection will be based on qualifications presented by responding firms, though the RFQ does not specify detailed evaluation criteria or weightings. No contract duration or total budget range is stated in the available documentation.
Opportunity text
Design for partial roof replacement of the existing 2-ply modified bitumen roofing system on Roof area A1 and A12 with a new 2-ply modified bitumen roofing system, approximately 36,718 total sq ft. Design the replacement and attachment of new thermal roof insulation with a coverboard. Design the replacement of new sheet metal coping. Design work will also include additional items of concern during initial site visit. Firm will provide turnkey design services including but not limited to roof replacement, permit applications as required, bidding, construction administration including scheduling, pre bid, preconstruction meetings, regular site construction meetings during the project, and project closeout.
Files
| File | Type | Posted |
|---|---|---|
| Designer Services for Knightdale High School Partial Roof Replacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity