The Town of Jupiter, Florida is requesting sealed bids for the Daniels Way Water Quality Improvements project (S2402), with bids due July 21, 2026 at 11:00 a.m. and a pre-bid meeting scheduled for July 1, 2026 at 2:00 p.m. at the Town of Jupiter Water Treatment Plant.

The scope encompasses canal maintenance berm clearing and grubbing; removal and reinstallation of a vehicular guard rail with temporary vehicular protection; installation of a 5-foot diameter Contech Inline CDS2020-5-C drainage treatment manhole into an existing 18-inch RCP drainage system; installation of two flumes along the High School ditch; stabilization of approximately 780 linear feet on both sides of the High School Ditch with filter fabric underlayment and 6-12 inch rip-rap; vegetation removal; restoration of maintenance berms, fencing, and the Daniels Way right-of-way; and restoration of any improvements damaged during installation and stabilization work.

Sealed bids must be submitted in both paper and electronic format to the Town Clerk at 210 Military Trail, Jupiter, Florida 33458. Bid security equal to five percent of the bid amount must accompany each submission. Bid documents are available beginning June 23, 2026 through Euna OpenBids (formerly DemandStar) at www.demandstar.com. All project inquiries should be directed in writing to Steven Montemayor, PE, Senior Utilities Engineer at StevenM@jupiter.fl.us with a read receipt requested. Clarifications and changes to bid documents will be issued as addenda through www.demandstar.com. The Town reserves the right to waive irregularities and reject any or all bids.

Opportunity text

The general nature and scope of this project is: Furnish all labor, equipment and materials necessary for clearing and grubbing canal maintenance berm; removing a vehicular guard rail, providing temporary vehicular protection and re-installing a vehicular guard rail; installation of a 5 ft. diameter Contech Inline CDS2020-5-C drainage treatment manhole into an existing 18 RCP drainage system; installation of two flumes along the High School ditch; stabilizing approximately 780 LF on both sides of the High School Ditch with filter fabric underlayment and 6-12 rip-rap (armor); removal of vegetation, restoring the maintenance berms, repairing any fencing, and restoring the Daniels Way ROW; and any other improvements damaged during the vegetation removal, water quality improvement installations and/or ditch bank stabilization process.