Dahl Restroom Renovation
Open State & local contract opportunity Posted
- Solicitation number
- PW#2025-068
- State
- Washington
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Fuadi Said fuadi.said@seattle.gov (206) 760-4044
- Gina Owens gina.owens@seattle.gov (206) 684-7251
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
King County is requesting bids on renovation of a fire-damaged park restroom and storage building, with proposals due October 28, 2026. The scope includes converting the existing restrooms into two single-occupancy facilities, replacing fire-damaged structural timber frames, installing shear walls, replacing the roof, removing an existing stone chimney, and replacing the entire electrical system. Site accessibility improvements encompass revising existing accessible parking stalls and affected sidewalk, and improving the pathway between the parking lot and restrooms.
Bidders must review the Project Manual (PW_2025-068_Dahl_Restroom_Reno_Project_Manual_-_signed.pdf, 29 MB), which contains detailed specifications, drawings, technical standards, construction methodology requirements, material standards, quality assurance protocols, inspection procedures, and project administration protocols. The manual establishes compliance requirements with applicable codes and regulations applicable to the renovation work.
No estimated contract value, contract term, set-asides, preferences, pre-bid meeting, question deadline, or incumbent information is provided in the source materials.
Opportunity text
Renovation of an existing Park's storage and restroom building which has received fire damage. Works include but not limited to renovating the restrooms to become two single occupancy restrooms, replacing fired damaged structural timber frames, adding shear walls, replacing existing roof, removing existing stone chimney, and replacing entire electrical system. Other accessibility related site improvements include revising existing accessible parking stalls and affected sidewalk, improving pathway between parking lot to the restrooms.
Files
| File | Type | Posted |
|---|---|---|
| PW_2025-068_Dahl_Restroom_Reno_Project_Manual_-_signed.pdf |