D03-ERI SR 4 Type 6 Curb Installation
Closed State & local contract opportunity Posted
- Solicitation number
- SRC0000040284
- State
- Ohio
- Responses due
Opportunity facts
Opportunity details come from ohiobuys.ohio.gov. Updated .
About this opportunity
The Ohio Department of Transportation is requesting bids for removal and installation of Type 6 curb on State Route 4 near Erie, with bids due July 23, 2026.
The scope includes disposal of existing curb and installation of approximately 125 feet of ODOT Type 6 curb on the southeast quadrant of the SR 4 approach to the bridge over the Norfolk Southern Bellevue Rail Yard, just north of the Huron County line. The work site is a 4-lane section where the right lane will be pre-closed with portable barrier. ODOT's geotech crew will have already removed approximately 4 feet of asphalt pavement, rough-graded the slope, and placed a dirt windrow roughly 5 feet behind the proposed curb location. The contractor must remove and dispose of the existing curb (located inside the windrow), perform fine-grading, and install new Type 6 curb with tie-ins to existing curb north and south of the work area. Type 6 curb specifications are defined in the attachments. Work is scheduled for fall 2026 (September–October).
Award will be made to the lowest bidder meeting all specifications.
Opportunity text
Lowest Bidder meeting all spec's will be awared the bid. Below is a summary of the work and location were project will take place. Type 6 curb is further defined in attachments. Dispose of existing curb and install 125 ft of new ODOT Curb, Type 6 on the southeast quadrant of Erie SR 4 approach to the bridge over the Norfolk Southern Bellevue Rail Yard (just north of the Huron County line). This is a 4-lane section of SR 4 and the right lane will already be closed with portable barrier. The slope location will have existing guardrail and approximately 4 ft wide asphalt pavement removed already and be rough graded by the geotech crew with a windrow of dirt placed approximately 5 ft behind the proposed curb location. The existing curb will be inside the windrow and need to be removed and disposed of as part of this work. Work will include disposing of the existing curb and fine-grading and placing Type 6 curb to tie into existing curb north and south of the work area. This work is intended to be completed in fall (Sept - Oct) 2026.