Cross Creek Outfall Project

Closed State & local contract opportunity Posted

Solicitation number
PWC2627013
State
North Carolina
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Fayetteville Public Works Commission is requesting statements of qualifications for professional engineering services on the Cross Creek Outfall Project, a sanitary sewer and water main relocation in Cumberland County, North Carolina, with statements due September 8, 2026 at 4:00 p.m.

The scope encompasses permitting, bidding, construction administration and observation, surveying, project management, as-built and record drawing services for approximately 2,000 linear feet of 36-inch sanitary sewer relocation between Greensboro Street and Hillsboro Street, 200 linear feet of 8-inch water main with railroad crossing, and integration of 1,037 linear feet of 8-inch water main along Edwards Street extending to the CSX Railroad at Fort Junction spur. The selected firm will coordinate with Norfolk Southern Railroad and CSX Railroad on encroachments and accelerated schedules.

Required qualifications include current North Carolina professional engineering and land surveying licensure, demonstrated NCDOT and NCDEQ coordination and permitting experience, railroad encroachment expertise with Norfolk Southern and CSX, and capability to perform survey and design work on compressed timelines. Firms must register as vendors through the iSupplier Portal, maintain General Liability insurance of $1 million per occurrence and $2 million aggregate, Worker's Compensation, and Automobile Liability coverage, comply with E-Verify requirements, and certify non-listing on the Iran Divestment List.

Qualifications statements are limited to 20 pages and will be scored on personnel (30%), consultants and sub-consultants (20%), project experience (25%), project approach and understanding (15%), and general qualifications (10%). Compensation will be based on hourly rates or fixed pricing as specified in a separate exhibit, subject to a payment cap established by PWC. Contract award is anticipated in September 2026. Written questions are due August 24, 2026 at 5:00 p.m., with an addendum deadline of August 31, 2026 at 5:00 p.m.

Opportunity text

The Cross Creek Outfall project will relocate approximately 2,000 LF of 36-inch sanitary sewer between Greensboro Street and Hillsboro Street. The project also includes 200 LF of 8-inch water main, with a railroad crossing. Design has been completed by Ardurra Group, Inc. (formally W.K. Dickson & Company). This is a continuation of the design, permitting, bidding, construction administration and observation, surveying, project management, as-built and record drawing engineering services. Additionally, PWC has designed 1,037 LF of 8-inch water main that will be incorporated into the project along Edwards Street. The project is from Hillsboro Street and terminates at the CSX Railroad (Ft. Junction spur). The designer will assist in coordination with Norfolk Southern Railroad and CSX Railroad. The designer will be incorporate the design and project quantities into the Cross Creek Outfall project. This is for permitting, bidding, construction administration and observation, surveying, project management, as-built and record drawing engineering services.