CRA Front Beach Road Segment 4. 1 Design-Build
Open State & local contract opportunity Posted
- Solicitation number
- PCB26-51-0-2026/CJ
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Carrie Jagers carrie.jagers@pcbfl.gov (850) 233-5100
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Panama City Beach, Florida is requesting design-build proposals for the reconstruction of Front Beach Road Segment 4.1, with proposals due October 28, 2026 at 9:00 a.m. CDT and a mandatory pre-proposal meeting scheduled for August 11, 2026 at 1:00 p.m. CDT in the Panama City Beach Council Chambers at 17007 Panama City Beach Parkway (virtual participation available upon request to bid writer Carrie Jagers with forty-eight hours' notice).
The scope encompasses roadway reconstruction from the end of Segment 3 near the Lullwater Drive intersection to east of Hills Road, including roadway widening with a landscaped median, median turn lanes, landscaping, trolley and bicycle lanes, pedestrian walkways, signage, lighting, pavement markings, drainage system improvements, and relocation and undergrounding of utilities within the right of way. The RFP package comprises 86.52 MB of specifications and documents available through DemandStar, with an addendum issued July 29, 2026.
As of the summary date, twenty-nine plan holders have registered interest, including construction firms such as 850 Construction Services LLC, B&T Fencing, Inc., and C.W. Roberts Contracting. The RFP was broadcast July 28, 2026. Specific contract value, contract term, bid bond requirements, and award date are not detailed in available documentation.
Opportunity text
This project includes the reconstruction of Front Beach Road Segment 4.1 from the end of the reconstruction of Segment 3 near the Lullwater Drive intersection to east of Hills Road. The project includes widening the roadway to include a landscaped median, median turn lanes, landscaping, trolley/bicycle lanes, pedestrian walkways, signage, lighting, pavement markings, drainage system, and the relocation and undergrounding of utilities that are within the right of way. A link to the related project documents and plans is contained in the Table of Contents of the package.
Files
| File | Type | Posted |
|---|---|---|
| CRA Front Beach Road Segment 4.1 Design-Build.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity