CR 16A & Timberwolf Trail Intersection Improvements

Closed State & local contract opportunity Posted

Solicitation number
3034-0-2026/AH
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

St. Johns County Purchasing Department is requesting sealed bids for construction and improvement of the CR 16A and Timberwolf Trail Intersection under IFB format, with bids due September 16, 2026 at 2:00 p.m. Eastern Time.

The scope includes roadway widening and reconstruction, milling and resurfacing, sidewalk connectivity, drainage improvements, pavement markings, signage installation, and associated utility and restoration work. All work must comply with the FY 2025-2026 Florida Department of Transportation Standard Specifications for Road and Bridge Construction, FDOT Design Standards, and the Manual of Uniform Traffic Control Devices. The contractor is responsible for all labor, materials, and equipment.

Place of performance is the CR 16A and Timberwolf Trail Intersection in St. Johns County, Florida. A non-mandatory pre-bid meeting is scheduled for Tuesday, August 18, 2026 at 1:00 p.m. EST at the St. Johns County Public Works Department, 2750 Industry Center Road, St. Augustine, Florida 32084. No bid bond is required. Bids are submitted via download through DemandStar; eBidding is not available. The bid package includes a bid document with specifications and two exhibits (Exhibit A and Exhibit B). No blueprints are included in the solicitation materials. No estimated contract value, contract term, or incumbent information is disclosed.

Opportunity text

The purpose of this IFB is to solicit Bids from qualified Bidders for the construction and improvement of CR 16A and Timberwolf Trail Intersection. The Contractor shall be responsible for providing any and all labor, materials, and equipment required in the contract documents. This project includes but not limited to widening and reconstruction of roadway, milling and resurfacing, sidewalk connectivity, drainage improvements, pavement markings, signage, and associated utility and restoration work. This project shall be in accordance with the FY 2025-2026 edition of the Florida Department of Transportations (FDOT) Standard Specifications for Road and Bridge Construction and the FDOT Design Standards and Manual of Uniform Traffic Control Devices (MUTCD).

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity