About this opportunity
Miami-Dade County Water and Sewer Department is requesting price quotations for the Consumer Line Relocation Program at various residential locations countywide under RPQ P20400, with electronic bids due July 21, 2026 at 10:00 a.m. and a mandatory pre-bid meeting on June 25, 2026 at 10:00 a.m. via Microsoft Teams. No Davis-Bacon wages, prevailing-wage maintenance, apprenticeship investment, DBE participation requirements, or SBE set-asides apply.
The scope involves disconnecting existing water meters from service lines at the rear or side of residential properties and relocating service to the front, including trench excavation, sand/fine gravel bedding, new copper piping and tubing, PVC valve boxes, vacuum breakers at existing and new hose bibbs, backflow prevention devices where applicable, irrigation meter/submeter connections where existing, pressure testing, flushing, disinfection, proper disposal of super-chlorinated water, backfilling, and landscaping restoration. The contractor bears full responsibility for owner coordination, obtaining and executing all required owner agreements and signatures, permitting (including plumbing and electrical permits from applicable municipal Building Departments), and final cleanup. All materials, labor, and equipment are included in the contract price.
The estimated project value is $2,181,800 (excluding contingencies and dedicated allowances), with a 2% User Access Program fee deducted from all payments. The anticipated project start is August 17, 2026, with a 180-calendar-day completion period. Liquidated damages are $1,000 per day for delays. Bids of $200,000 or more require bid bonds, and performance and payment bonds upon award. The contractor must hold a valid General Contractor or State-licensed Plumber certificate; electrical contractor and master plumber subcontractors are required for primary trade work. Bidders must demonstrate at least three relevant references and familiarity with Miami-Dade Water and Sewer Department guidelines. Required insurance includes workers' compensation, commercial general liability of $1,000,000 per occurrence/$2,000,000 aggregate, and automobile liability of $1,000,000 combined single limit. All newly hired employees must be verified through the E-Verify System under Florida Statute 448.095. Electronic submission is through the Trimble Unity Construct (eBuilder) Bid Portal, with hard copies postmarked within one business day of electronic submission.
Opportunity text
This work involves disconnecting existing water meters from the service water lines located at the rear or side of the properties and connecting new water service lines of the residences to the existing water meter at the front of the property, as shown on the attached sketch in the appendices. The Contractor shall be solely responsible for obtaining, executing, and securing all required signatures for the Owners Agreement. All labor coordination, administrative effort, and any other cost associated with this requirement shall be included in the Contract Price. The Contractor shall meet with the property owners/tenants at the site where the conversion will be performed, and the property owner shall have the opportunity to review the proposed route and provide input. The contractor shall also be responsible for obtaining the owner's signature for all required permits and for preparing, submitting, and securing all necessary permits, including plumbing and electric permits, from the applicable municipal Building Department where the work is to be performed. The Contractor shall furnish all materials, labor, and equipment as specified or necessary for a complete Project including but not limited to trench excavation, placing a sand/fine gravel bed on the bottom of the trench for pipe bedding, furnishing and installing the new water service from the new water meter located in front of the property to the existing household potable water system connection point, which includes copper pipes, tubing, fittings, valves, PVC valve boxes, grounding system (where applicable) and the installation of the new vacuum breaker at each existing and new hose bibb; furnishing and installing backflow prevention devices where applicable, install all piping, fittings, valve box and accessories to connect irrigation meter/submeter where existing, performing pressure tests on the new water service pipe, flushing, disinfecting the new service line, disposing of super chlorinated water properly, backfilling and compacting the trench, cutting and plugging existing water service line(s) located inside of the property, removing and disposing of the existing water meter box, filling void (at the abandoned 1-inch wing style angle stop valve) with ready mix concrete to 2-inches above the existing and to be abandoned 1-inch wing style angle stop valve, placing top soil on top of concrete and laying sod as needed to cover area or the necessary material to match the existing condition at this location, performing final cleanup/restoration and landscaping of the disturbed areas to equal or better condition. The Work also includes the safety and protection of the homeowners property, coordinating and obtaining necessary inspections from the Building Office of the municipality in which the work is to be performed, proper disposal of removed materials and other appurtenant and miscellaneous related items, and completion of the work to ensure a finished project. The County has allocated certain funds for this project. Should the amounts bid exceed expected levels, the Department reserves the right to either reduce quantities and/or delete elements of the work while proceeding at the prices bid or reject bids and re-advertise at its sole option. It is the intent of the Department to obtain a complete, functional, and satisfactory installation under this Contract, and any items of labor, equipment, or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied, whether or not they are specifically stated herein.
Files
| File | Type | Posted |
|---|---|---|
| miami-dade RPQ_No_P20400.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity