The Lake Orion Downtown Development Authority (DDA) has issued a Request for Proposals (RFP) for design and build services to construct two dumpster enclosures in the downtown Lake Orion area. The project involves creating two separate enclosures: one behind 120 S. Broadway and 85 W. Flint, which will accommodate 3 grease traps and two dumpsters, and another in the northwest corner of a parking lot at Anderson Street and Front Street, designed to hold one dumpster. Qualified professionals are required to submit proposals that meet specific zoning requirements, including constructing completely enclosed decorative masonry screen walls, steel-reinforced opaque and lockable wooden gates, and maintaining a maximum height of six feet. The evaluation criteria will focus on "best overall value," considering technical approach, professional qualifications, previous experience, and competitive pricing. Proposals are being accepted from February 5 to February 28, 2024, with a site tour scheduled for February 14, 2024. The proposals will be opened on March 1, 2024, at 1 pm, with a review and potential interview period from March 4-8, 2024, and a final selection anticipated on March 12, 2024. The RFP does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. Bidders must provide references, proof of insurance, and an itemized quote of services. The concrete surface within the enclosures must extend at least ten feet in front of the enclosure, and contractors must comply with non-discrimination policies and ethical standards. While no specific budget range is provided in the documentation, the DDA reserves the right to split or abstract proposals and award multiple contracts based on price, availability, and service. The project aims to enhance the downtown area's aesthetic and functional waste management infrastructure, with the selected contractor expected to meet comprehensive insurance requirements, including general liability insurance of at least $1 million and workers' compensation insurance. The documentation suggests this is a localized project specific to the Lake Orion Downtown Development Authority, with no mention of incumbent vendors or existing technology integration requirements.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
two enclosure desgn build rfp January 2024.pdf | 1MB | 1/17/24 | ||
Dumpster Enclosure RFQ.02.14.2023.pdf | 578KB | 1/17/24 | ||
Addendum enclosure desgn build.24.02.05.pdf | 1MB | 1/17/24 |