About this opportunity
Collier County Board of County Commissioners Procurement Services Division is requesting proposals for Construction Engineering and Inspection (CEI) services for the Pine Ridge Road Corridor Improvements Project (RPS No. 26-8674), with proposals due August 5, 2026. Prime consultants must be pre-qualified through the Florida Department of Transportation in Group 10 CEI work groups (10.1 and 10.4), a gateway eligibility requirement; consultants and/or subconsultants must also hold pre-qualification in Group 8 (Surveying and Mapping), Group 9 (Soil Exploration, Material Testing, and Foundations), and Group 10.3 (Construction Materials Inspection).
The scope encompasses CEI services for approximately 1 mile of Pine Ridge Road improvements (west of Livingston Road to east of Whippoorwill Lane) plus approximately 0.5 mile of Livingston Road work, including a Jug-Handle intersection design at the Pine Ridge/Livingston intersection, a conventional intersection at Pine Ridge/Whippoorwill Lane, drainage improvements, sidewalk installation, and traffic signals. CEI duties include project administration, record keeping, construction inspections, material acceptance testing, and off-site activity monitoring for asphalt paving and miscellaneous structures.
Personnel must include a CEI Senior Project Engineer with a Florida PE license, civil engineering degree, and six years of experience (two years in major road or bridge construction); a CEI Project Administrator/Project Engineer with a civil engineering degree and two years of construction experience; FDOT CTQP-certified inspectors; and support staff. A field office within reasonable proximity to the project is required. The anticipated construction duration is 730 days, commencing upon Notice to Proceed.
The total estimated project construction cost is $20 million; Collier County estimates CEI costs historically represent 5% to 12% of construction costs. Prices must remain firm for the contract term with no surcharges. Evaluation criteria are ability of professional personnel (20 points), certified woman and/or minority business enterprise status (5 points), past performance (25 points), project approach and time/budget compliance (20 points), location (10 points), and recent and projected workloads (20 points). The firm or its affiliate cannot have served as Engineer of Record on the project.
Opportunity text
CEI services are required for the Pine Ridge Road Corridor Improvements Project. The project includes road and intersection improvements along Pine Ridge Road, approximately 1 mile in length, from west of the intersection of Pine Ridge Road and Livingston Road to east of Whippoorwill Lane. It also includes improvements extending approximately of a mile in length along Livingston Road north and south of the Pine Ridge/Livingston Road intersection. The project will consist of new Jug-Handle intersection design at the Pine Ridge Road/Livingston Road intersection that will direct southbound motorists wishing to turn left (east) through the main intersection and enter a loop ramp back to Pine Ridge Road where they will head east through the main intersection. The project will include a conventional intersection at the Pine Ridge Road/Whippoorwill Lane intersection, along with drainage improvements, sidewalk, and traffic signals.