Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Open State & local contract opportunity Posted
- Solicitation number
- 2026-RFQL-054
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Napa is requesting qualifications from multidisciplinary engineering consulting firms for a comprehensive Conn Dam Stability Assessment, Spillway Improvements, and Long-Term Reservoir Expansion Feasibility Study, with qualifications due October 29, 2026. The City will conduct a Qualifications-Based Selection (QBS) process consistent with 2 CFR Part 200 and the Brooks Act, anticipating federal funding participation through the U.S. Army Corps of Engineers (USACE).
The scope spans three sequential phases: Phase One generates a geotechnical data report due to the California Division of Safety of Dams (DSOD) by December 31, 2028; Phase Two assesses dam stability, including deformation estimates under static and seismic conditions; and Phase Three develops a feasibility alternatives analysis addressing identified deficiencies, including known spillway deficiencies. The selected consultant must provide professional engineering, geotechnical, environmental, hydraulic, structural, dam safety, and economic evaluation services to support regulatory compliance with DSOD, advance USACE-authorized flood risk reduction studies, evaluate long-term water supply improvements, and prepare technical foundations for future environmental review, design, permitting, and construction.
The Conn Creek Dam project is included by name in the 2022 Water Resources Development Act (WRDA), positioning it for federal funding support through USACE initiatives. The City intends this procurement to support both the immediate geotechnical and stability phases and eventual design and construction phases backed by federal resources. No specific contract value, contract term length beyond the DSOD reporting deadline, or place of performance scope is detailed in the available materials.
Opportunity text
The City of Napa (City) requests qualifications (Qualifications) from qualified individuals or firms (individually, a Respondent and collectively, Respondents) for Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study (Project). The City is seeking highly qualified multidisciplinary engineering consulting firms specialized in dams to provide professional engineering, geotechnical, environmental, hydraulic, structural, dam safety, and economic evaluation services for the Conn Dam Stability Assessment, Spillway Improvements, and Long-Term Reservoir Expansion Feasibility Study. The selected Consultant shall provide comprehensive engineering services to support regulatory compliance with the California Division of Safety of Dams (DSOD), assist the City in advancing federally authorized flood risk reduction studies through the U.S. Army Corps of Engineers (USACE), evaluate long-term improvements to increase water supply reliability, and prepare the technical basis for future environmental review, design, permitting, and construction. The City intends to procure these services using a Qualifications-Based Selection (QBS) process consistent with applicable federal procurement requirements, including 2 CFR Part 200 and the principles of the Brooks Act, as it is anticipated federal funding will be a part of the design and construction funding. The first phase of the project will generate a geotechnical data report that must be submitted to DSOD by December 31, 2028 followed by phase two with an assessment of the dams stability, including deformation estimates, under static and seismic conditions. Phase three will develop a feasibility alternatives analysis report addressing all identified deficiencies including the known spillway deficiencies. The City has been included by project name Conn Creek Dam, California in the 2022 Water Resources Development Act of 2022 (WRDA) and requested to be included in the USACE WRDA 2028 workplan with goal of completion of the alternative and design within 3 years inclusion in work plan.