Collective Storm Drainage Improvement Project - Series Q
Open State & local contract opportunity Posted
- Solicitation number
- FY27-ITBCon-27
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from charlottenc.bonfirehub.com. Updated .
About this opportunity
Mecklenburg County and Charlotte City are requesting bids for the Collective Storm Drainage Improvement Project - Series Q, a two-site storm drainage rehabilitation project with bids due November 3, 2026. The estimated project cost is $1.397 million.
The scope consists of two separate projects. At 805 Lynn St., the work includes installation of 308 linear feet of 48-inch reinforced concrete pipe along a new alignment that diverts the system away from an apartment complex, and cleaning and pipe-in-pipe lining of 139 linear feet of 15-inch reinforced concrete pipe. At 3653 Trailer Dr., the contractor must realign the existing 24-inch system to a new outfall point into the stream and line 100 linear feet of 24-inch corrugated metal pipe at the upstream end with pipe-in-pipe technology.
No set-asides, preferences, or eligibility restrictions are identified in the source. No incumbent contractor, contract term, evaluation criteria, question deadline, pre-bid meeting, or site-visit date are specified.
Opportunity text
The Project consists of two separate projects, 805 Lynn St. and 3653 Trailer Dr. The proposed plans for the 805 Lynn St. project calls for installation of 308LF of 48" RCP along a new alignment that shifts the system away from the apartment complex. There is also a 139LF section of 15" RCP to be CIPP lined. 3653 Trailer Dr. aims to realign the existing 24" system to a new outfall point into the stream. The design also requires lining 100LF of 24" CMP with CIPP at the upstream end of the system. The estimated cost for this project is $1,397,338.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity