City Hall Elevator Modernization

Closed State & local contract opportunity Posted

Solicitation number
26 - 010
State
Washington
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from federalwaywa.bonfirehub.com. Updated .

About this opportunity

King County is requesting proposals for City Hall elevator modernization to repair and replace equipment and bring existing elevators into compliance with ASME 17.1–2019 and current electrical and building codes, with proposals due September 12, 2026.

The scope includes replacement or renovation of controllers, communication systems, hydraulic and power units, hoistway infrastructure, car emergency lighting, operating panels, 3D infrared door-edge protection, handrails, hall fixtures, door equipment, pit ladders, stop switches, and all necessary electrical and mechanical upgrades. Work must include code-related fire blocking or fire-rated insulation as required. The contractor must obtain all L&I, electrical, and specialty permits; provide all equipment, labor, and materials; and deliver a complete, safe, and operable turnkey installation using new materials installed in a professional, workmanlike manner in compliance with L&I and local building codes.

No contract value, incumbent information, evaluation criteria, pre-bid meeting date, question deadline, or contract term length is specified in the source materials.

Opportunity text

This project shall consist of: Repairing and replacing equipment to modernize existing elevator to meet current electrical and elevator codes (ASME 17.1 - 2019) The scope of work for this project includes (but is not limited to) all work related to the renovation and/or replacement of the following items: controller, communication upgrades, hydraulic unit, power unit, hoistway updates, car emergency lighting system, car operating panel, 3D infrared door edge protection, handrails, hall fixtures, door equipment, pit ladder, stop switches, necessary electrical and mechanical upgrades, machinery, including any code related fire blocking or fire rated insulation. The Contractor shall be responsible for the following: 1. Providing L & I, Electrical and Specialty permits, equipment, labor, and materials to complete the work in a safe, clean and workman like manner. 2. Ensuring that the Work is compliant with L & I and local building codes. 3. Ensuring that all Work shall be performed using new materials, free of defects, installed in a professional, workmanlike manner to provide a "Turn Key" complete, safe and operable installation as specified in the project documents.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity