Cedar Hills Regional Landfill Pilot-Scale Micro-Electrolysis

Open State & local contract opportunity Posted

Solicitation number
KC001738
State
Washington
Responses due

Opportunity facts

Jurisdiction
Points of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

King County Department of Natural Resources and Parks Solid Waste Division is requesting bids on a pilot-scale micro-electrolysis treatment system for Cedar Hills Regional Landfill under ITB KC001738, with bids due October 22, 2026 at 1:30:59 PM and a pre-bid conference on October 13, 2026 at 10:00 AM (both via Microsoft Teams). A 5% minimum utilization requirement for King County Certified Small Contractors and Suppliers (SCS) and a 2% minimum Apprentice Utilization Requirement apply.

The scope targets arsenic removal from industrial wastewater at the methane processing plant prior to discharge to the King County publicly owned treatment works in Renton under Waste Discharge Permit No. 7842-04. The micro-electrolysis technology was developed by the University of Washington and designed by WSP USA. Work includes obtaining all necessary permits, furnishing and installing the ME reactor with platform and stairway foundation slabs and anchoring, installing pilot-scale treatment equipment with interconnecting piping, valves, and instrumentation, furnishing initial bulk chemicals and media, installing site utility hookups to existing onsite power (underground and above-grade connections), hydrostatic and leak testing, and pre-commissioning, commissioning, inspections, and final system testing. Subcontracting opportunities span Construction Surveying, Stormwater and Sediment/Erosion Control, Earthwork, Concrete and Masonry, Special Construction, Plumbing, Electrical, and Pollution and Wastewater Equipment.

The Engineer's Estimate is $966,400. The work site is Cedar Hills Regional Landfill, 228th Ave SE, Maple Valley, Washington 98038. Bidders must submit a bid guaranty bond of at least 5% of the total bid price and comply with Washington State prevailing wage requirements (Chapters 39.12 and 49.28 RCW). The selected contractor must furnish a 100% Performance and Payment Bond and provide certificates of insurance as specified. Bids must be submitted electronically via King County's E-Procurement Supplier Portal in PDF format (maximum 25 megabytes). All inquiries must be submitted via email to the Contract Specialist at least seven days before bid opening.

Opportunity text

The pilot-scale ME project, which targets arsenic in industrial wastewater from the methane processing plant located at CHRLF, is part of the overall leachate and lagoon improvements project at CHRLF. The pilot-scale ME technology and treatment system has been selected to pretreat the industrial wastewater stream from the methane processing plant prior to the stream entering the leachate lagoon pretreatment system. The experimental ME technology was developed by the University of Washington (UW) and designed at current scale by WSP USA (WSP). CHRLF discharges industrial wastewater collected at the landfill to the King County publicly owned treatment works (POTW) in Renton, Washington, under Waste Discharge Permit No. 7842-04 (discharge permit), issued to the County by the King County Industrial Waste (KCIW) program. The Work includes but is not limited to the following features: 1. Obtain all permits necessary to perform the Work. 2. Furnish and installation of ME reactor and platform foundation slab and stairway foundation slab, including all required anchoring. 3. Furnish and installation of pilot-scale ME treatment system equipment, interconnecting piping and valves, and instrumentation. 4. Furnish initial bulk chemicals and media. 5. Installation of site utility hookups to existing onsite power, including underground and above-grade connection points for the pilot system and associated installations. 6. Hydrostatic and leak testing. 7. Pre-commissioning, commissioning, inspections, and final system testing. Subcontracting opportunities: Construction Surveying, Stormwater and Sediment/Erosion Control, Earthwork, Concrete and Masonry, Special Construction, Plumbing, Electrical, Pollution and Wastewater Equipment. 5% minimum requirement for King County Certified Small Contractors and Suppliers (SCS). 2% minimum Apprentice Utilization Requirement.

Files

File Type Posted
KC001738-itb-vol-1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities