Canopy Renovation

Closed State & local contract opportunity Posted

Solicitation number
ITB 090926
State
Michigan
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Dearborn is requesting bids for metal roof replacement and structural steel restoration at the Department of Public Works Yard (2951 Greenfield Road) under ITB, with bids due September 30, 2026 at 3:00 p.m. via BidNet Direct and a mandatory onsite visit on September 17, 2026 at 10:00 a.m. A local-vendor preference applies: Dearborn-based businesses with verifiable city addresses and one year of property tax payment history are considered equally competitive within 10 percent of the lowest bid.

The scope covers two open-sided heavy equipment canopies (approximately 180 feet long by 60 feet wide by 22 feet high each). Work includes removal of existing welded metal deck systems, plywood sheathing, and built-up ballasted asphalt roofing to a licensed landfill; lead paint abatement of structural steel members (bar joists, L angles, C channels, girders, and cross bracing) to SSPC-SP3 standard using power tool cleaning with shrouded tooling and HEPA filtration, with contaminated material disposal at a licensed site; installation of new 22-gauge metal roof panels per manufacturer specifications; and provision of stamped structural engineered drawings addressing all implied loads, uplift, live and dead loads, and fastening systems. A qualified licensed paint contractor or abatement company must perform lead paint removal and new coating.

Bidders must demonstrate a minimum of five years of similar experience and successful completion of at least three comparable projects within the past five years. Pricing must be submitted as a not-to-exceed total cost with itemized line items for sandblasting protection, coating systems labor and materials, roof demolition and disposal, metal roofing installation labor and materials, and stamped structural engineering. Insurance requirements include $1 million commercial general liability per occurrence, $1 million owner's protective liability, builders' risk at 100 percent replacement value, and $3 million commercial umbrella/excess liability. A two-year warranty on workmanship and manufacturer warranties are required. Expected completion is no later than 14 days after contract execution, with $300 per day delay penalties for work exceeding 60 calendar days. Pre-bid questions are due September 23, 2026 at 1:00 p.m. All submissions must be uploaded electronically to MITN with a 20 MB file size limit; hard copies are not accepted.

Opportunity text

Provide all skilled trade services, materials and equipment for removal of existing roof system off site to a licensed landfill composed of welded metal deck system, plywood/sheathing, built-up ballasted asphalt roofing (complete roofing system). Preparation of structural steel for paint coating system which comes in direct contact with the corroded (rusted) top bar joist cords, L angles (originally paint-coated with lead paint) and its edging as well as any other structural members such as C channels (minimum fascia at eves and rakes), girders or cross bracing. The building size (2) are approximately 180L x 60W x 22H which roof system is to be replaced. Stamped engineered drawings are required for the new roof system which includes but not limited to all implied loads, uplift, live and dead loads which bear on structural columns, girders, purlins, C channel, bar joists, lateral bracing, roof sheathing and fastening system. The preparation of existing steel in contact with flaking corrosion (rust) on the bar joists top cords and its edging and other structural members in direct contact with the new metal roof system which tested positive for lead paint to be removed by a qualified licensed paint contractor (or abatement company) for both removal of lead paint and new paint coating system of the buildings structural steel. Removal of existing corroded metal originally coated with lead paints to standard of SSPC-SP3 power tool cleaning with mechanical means - grinding with shrouded tooling (or chemically) with HEPA filter vacuum system and containing all residual rust or remaining coating and removal off site to licensed disposal site for contaminated materials. Associated electrical work, lighting, and power by City of Dearborn or contracted electrician and coordination with the project.

Files

File Type Posted
DPW Canopy Roof Replacement.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity