Bridge Superstructure Replacement (SN 016-0927) - Cook County
- The Illinois Department of Transportation (IDOT) is soliciting electronic bids for bridge deck overlay and bridge joint replacement on Ogden Avenue over Illinois Route 50 in Cook County under Contract No. 62Y20, with bids due July 31, 2026 at 12:00 p.m. via the iCX system. This is a federal-aid contract requiring compliance with both state and federal regulations. The scope encompasses deck patching, bridge deck joint replacements, hydro-scarification, and bridge deck overlay construction on...
- The Illinois Department of Transportation (IDOT) District 3 is requesting sealed bids for superstructure replacement and deck work on six bridges and associated repairs on five additional structures along I-57 in Iroquois County, with electronic bids due June 12, 2026 at 12:00 p.m. via the iCX system. This is a federally funded project under the National Highway Performance Program (NHPP). The scope spans approximately 5.11 miles of I-57 from 0.3 miles north of Prairie Creek to 0.7 miles south...
- The Illinois Department of Transportation (IDOT) is soliciting bids for reconstruction of the Glenwood Road Bridge (Structure Number 016-0793) over Butterfield Creek in the Village of Glenwood, Cook County, with electronic bids due July 31, 2026 at 12:00 p.m. through the iCX-Integrated Contractors Exchange system. The scope encompasses joint reconstruction with strip seals, hydro-scarification at 3/4-inch depth, deck repairs, installation of a 2-inch latex concrete overlay with diamond grinding,...
- The Illinois Department of Transportation (IDOT) is soliciting bids on behalf of Cook County for bridge overlay, joint repair, pier repair, and HMA resurfacing on Pulaski Road over CSXT Railroad (Structure S.N. 016-0747) in the Village of Alsip, with bids due July 31, 2026 at 12:00 p.m. through the iCX-Integrated Contractors Exchange system. DBE participation requirements apply. The scope encompasses bridge deck scarification and latex concrete overlay; transverse joint repair at north and south...
- Illinois Department of Transportation is requesting bids on an asphalt overlay and pavement project on I-294 under Invitation I-25-2033, with proposals due July 31, 2026. The source provides minimal detail beyond the project identifier, state, and deadline. No contract value, scope dimensions, place of performance beyond the I-294 corridor, contract term, set-asides, preference programs, incumbent contractor, evaluation criteria, pre-bid meeting, or question deadline are specified in the...
The Illinois Department of Transportation is requesting sealed bids for bridge superstructure replacement and widening of Oak Park Avenue (FAU Route 2774) over I-80 in Tinley Park, Cook County, under Contract 62W20 (Structure Number 016-0927), with bids due July 31, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system. The project is funded through federal-aid highway program resources (Project NHPP-EU65(445), District 1). The scope encompasses bridge superstructure replacement and widening to accommodate increased shoulder widths and a shared pedestrian path; replaced approach slabs; continuation of the new shared use pedestrian path; removal and installation of new guardrail; striping; drainage improvements; and associated work as shown on plans. Significant utility relocations and adjustments are required, including coordination with AT&T, ComEd, and Nicor Gas, with estimated durations incorporated into the project timeline. Construction must comply with the Standard Specifications for Road and Bridge Construction (adopted January 1, 2022, revised January 1, 2026) and the Manual on Uniform Traffic Control Devices, with strict lane closure hour restrictions on I-80 to maintain expressway traffic flow. Bidders must execute state and federal certifications as part of the proposal; false or fraudulent certifications constitute breach of contract and grounds for termination. The contract will be awarded to the lowest responsive and responsible bidder meeting conformity with IDOT terms and conditions. The specifications include supplemental requirements and special provisions addressing traffic control on expressways, hot-mix asphalt construction, bridge deck construction, utilities coordination, and environmental compliance.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
ildot 62W20-009.pdf | 9MB | 7/8/26 |