The Town of Reading, Massachusetts is requesting sealed bids for the complete replacement of two pneumatic ejector pump stations with new submersible pump stations at Brewer Lane and Joseph Way, with bids due September 17, 2026 at 1:00 p.m. at Town Hall. A mandatory site visit was held August 26, 2026 at the Joseph Way pump station site.
The scope includes demolition and removal of existing stations, construction of new wet wells and gravity manholes, installation of new submersible pumps, and new connections to existing force mains at two locations in Reading. The contract completion time is 250 calendar days, with the first 60 days focused on shop drawings and preparation, commencing within seven days after notice to proceed. This is a single-prime-contract project.
Massachusetts prevailing wage rates apply under Massachusetts General Laws Chapter 149, Sections 26–27D as determined by the Commissioner of Department of Workforce Development. All on-site employees must have no less than ten hours of OSHA-approved safety and health training. The contract is subject to Massachusetts General Laws Chapter 30, Section 39M bidding requirements.
Prospective bidders must submit three or more references for similar work performed within the last five years and provide proof of sufficient equipment, qualified employees, and financial ability to complete the work. Bid security of 5% of the bid amount is required in the form of a certified check, bid bond, or treasurer's check payable to the Town of Reading. Joint venture bids are not accepted. The Town will award to the lowest responsible and qualified bidder and reserves the right to reject any and all bids or award based on the Town Manager's determination of public interest.
Opportunity text
The Scope of Work under this Contract includes the complete replacement of two existing pneumatic ejector pump stations with new submersible pump stations, including demolition and removal of the existing stations, construction of new wet wells and gravity manholes, installation of new pumps, and new connections to the existing force mains. The project sites are located at the end of Brewer Lane and along the access road extending from the intersection of Joseph Way and Kieran Road in Reading, Massachusetts 01867. Project will be constructed under a single prime contract.
Files
| File | Type | Posted |
|---|---|---|
| Reading Brewer Lane and Joseph Way PS Improvements July 2026 - Specifications.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity