B52 – B53 Final Transition Duct Liner System Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- 1412210678
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Jason Behr behrjv@jea.com (904) 665-6740
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Jacksonville Electric Authority (JEA) is soliciting proposals for engineering, design, fabrication, and installation of transition duct liner systems for two gas turbine units, with responses due September 15, 2026 at 12:00 PM EST and a mandatory pre-response meeting on August 24 at 11:00 AM EST via Microsoft Teams.
The scope covers demolition and removal of existing liners in sections G, H, and J of the transition duct on each gas turbine unit, followed by fabrication and installation of new replacement liners, hardware, and insulation systems for the Heat Recovery Steam Generator (HRSG) transition ducts. The contractor must furnish all labor, supervision, materials, cranes, subcontractors, and scaffolding; delivery is on a delivered basis to the site.
JEA intends to award one contract, though it reserves the right to award multiple contracts or exclude certain work items. Award will be to the responsive and responsible respondent meeting all minimum qualifications on a lowest-bid basis. Minimum qualifications require that the respondent not be on any debarred or suspended vendor list and have successfully completed three similar projects within the past five years, each totaling at least $200,000 or 3,000 square feet. A bid bond equal to 5% of the total bid amount is required; payment and performance bonds are required after award. Pricing must include all travel, shipping, and materials costs. JEA offers optional early-payment discounts of -1% net 20 or -2% net 10.
The contract incorporates liquidated damages tied to project completion deadlines. Contractors utilizing Jacksonville Small and Emerging Business (JSEB) certified firms must ensure equal or better payment terms and track all payments through the B2Gnow system. Contractors must comply with JEA's Contractor Safety Management Process and maintain current insurance, licenses, and certifications throughout the contract term. Responses are submitted through JEA's Zycus e-procurement portal.
Opportunity text
The purpose of this solicitation is for the engineering, design, fabrication, and installation of sections G, H and J of the transition duct liners for two gas turbine units as described herein. This specification also covers demolition and removal of the existing liner in G, H, and J sections of the transition duct on each gas turbine. The awarded Company is to furnish all labor, supervision, material, cranes, subcontractors, scaffolding, etc. to engineer, design, fabricate, deliver to the site, unload, and install new replacement liner, hardware, and insulation system for the last three sections of each Heat Recovery Steam Generator (HRSG) transition duct in its entirety (4 surfaces).
Files
| File | Type | Posted |
|---|---|---|
| 1412210678 Solicitation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity