Atlas Substation Testing and Commissioning Project
Closed State & local contract opportunity Posted
- Solicitation number
- B068-26
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Hugo Lopez hlopez@brownsville-pub.com (956) 983-6364
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Brownsville Public Utilities Board is requesting sealed bids for testing and commissioning of the Atlas Substation, a new 138-kV electric transmission facility in Cameron County, Texas, with bids due October 14, 2026 at 5:00 p.m. and public opening on October 15 at 10:00 a.m.
The scope covers testing and commissioning of a 138-kV substation with a three-breaker arrangement, three incoming transmission lines, two 15/20/25/28-MVA step-down transformers feeding 12.47-kV, a 2000-ampere switchgear lineup in an elevated outdoor enclosure, a separate control building, and integration with the BPUB's 138-kV transmission system. The successful contractor must provide a one-year warranty on all work, equipment, and materials following final acceptance.
Bids must include a certified or cashier's check or bid bond equal to no less than five percent of the total bid amount with a $2,500 minimum. The awardee must execute a Performance Bond and Payment Bond for the full contract amount within ten calendar days of award. The contract is anticipated to commence in March 2027. The BPUB is exempt from federal excise taxes, state taxes, and local sales taxes; bidders must exclude all taxes from pricing. Payments will be made via ACH direct deposit.
All contractors and subcontractors must submit Pre-Bid Disclosure Statements, W-9 or W-8 forms, debarment certifications, ethics statements, and other compliance documentation. The BPUB reserves the right to reject any or all bids and to increase or decrease quantities by up to 25% without adjusting unit prices. A non-mandatory pre-bid conference is scheduled for September 30, 2026 at 10:00 a.m.; site visits are encouraged. Board approval is anticipated for November 9, 2026, with bid evaluation occurring between October 16 and 23.
Opportunity text
The Project consists of a new 13812.47-kV Atlas Substation. The substation shall be a 138- kV (3) three breaker arrangement with three incoming lines feeding (2) two 15/20/25/28- MVA 138/12.47-kV transformers. The transformers shall feed a lineup of 12.47-kV, 2000A switchgear via underground cables. The switchgear shall be located in an elevated outdoor enclosure. All equipment necessary for operation and control of the substation shall be in a separate control building. The substation will connect to the BPUBs 138-kV transmission system.
Files
| File | Type | Posted |
|---|---|---|
| B06826 ATLAS SUBSTATION TESTING AND COMMISSIONING PROJECT FINAL.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity