About this opportunity

The City of Artesia is requesting bids on development and construction of the Artesia Botanical Garden on 1.44 acres, with bids due October 12, 2026 at 3:00 p.m. PDT and a mandatory pre-bid meeting on September 15, 2026 at 9:30 a.m. PDT at 11462 178th Street, Artesia, California. Attendance at the pre-bid meeting is required, and vests are mandated for site visits.

The scope includes site demolition, construction of a community center building, landscaping and irrigation systems, utilities installation, perimeter wall construction, and street improvements across 1.44 acres. The awardee must hold a California Class A license and be registered as either a California Department of Industrial Relations Public Works Contractor or California Secretary of State entity.

The project is on a lump-sum basis with an estimated start date of December 1, 2026 and a duration of 15 months. Liquidated damages are assessed at $1,000 per day. A bid bond of 10 percent, performance bond of 100 percent, and payment bond of 0 percent are required. Bid prices must remain valid for 60 days. The online question-and-answer period closes September 28, 2026 at 4:00 p.m. PDT. Bids must be submitted through the PlanetBids vendor portal. Contact Leslie Nacionales, City of Artesia Department of Administrative Services, by telephone at 562-366-2674 or email at lnacionales-tafoya@cityofartesia.us.

Opportunity text

2 versions

Update #2 · Latest ·

The bids are for a public works project which consists of the installation of Poured in Place (PIP) playground surface, installation of the new play equipment, and removal and replacement of concrete sidewalk and all related work on file with the Citys Public Works Department.

Update #1 ·

The proposed work is a development of 1.44 acres of land including site demolition and construction of The Artesia Botanical Garden that includes construction of a community center building, landscaping and irrigation, utilities, perimeter wall, and street improvements.

Files

File Type Posted
Sierra Vista Playground Replacement.pdf PDF
Artesia Botanical Garden.pdf PDF