Rehabilitation of the 1. 0 MG Keller Smithfield Elevated Storage Tank
Closed State & local contract opportunity Posted
- Solicitation number
- 26-010
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Jaime Kovar j.kovar@wallercounty.us (979) 826-7670
- Rick Hardcopf rhardcopf@cityofkeller.com (817) 743-4089
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Waller County, Texas is requesting proposals for all hazards preparedness, planning, consulting, and recovery services under RFP R26-010, with sealed proposals due August 20, 2026 at 1:00 p.m. CST to the Waller County Judge's Office.
The scope encompasses professional planning, advising, consulting, and continuity of operations activities including emergency operations planning and response, hazard mitigation, incident response, training and exercise programs, asset management, testing, regional response, decontamination, continuity of operations planning, data management, debris cleanup and monitoring, and technical assistance related to FEMA Public Assistance and Hazard Mitigation Grant Programs. The County also seeks assistance with CDBG and CDBG-DR funding, HUD coordination, and compliance with federal regulations including the Stafford Act and 2 CFR 200.
The contract term is thirty-six months with two optional one-year renewal periods, terminable by either party with thirty days' written notice. Respondents must provide hourly rates for specified consulting and debris management positions covering all costs including insurance, overhead, and profit; non-labor costs such as travel and expenses are billed at cost without markup. The County is exempt from state sales and federal excise taxes, and proposals must reflect this exemption.
Evaluation criteria are weighted as follows: firm experience (45%), firm management plan (25%), price (25%), and required forms and overall completeness of submission (5%). Respondents must provide proof of current insurance coverage including workers' compensation, employers' liability ($1,000,000), commercial general liability ($1,000,000 per occurrence, $2,000,000 aggregate), and business automotive liability ($1,000,000). The County reserves the right to award to one firm or multiple vendors and may negotiate with top-ranked respondents. Proposals must comply with federal debarment certification, Israel and energy company boycott certifications, and firearm industry non-discrimination requirements. Evaluation is scheduled for the week of August 24, 2026, with Commissioners Court authorization to negotiate on September 16, 2026, and final contract approval on October 14, 2026.
Opportunity text
2 versions
Update #2 · Latest ·
The work (Base Bid) for the Rehabilitation of the 1.0 MG Keller Smithfield EST includes, but is not necessarily limited to, the following major items: Complete replacement of the exterior coating system including the abrasive blasting and containment system. Complete replacement of the wet interior coating including the surface preparation blasting, including removal of sediment from washing operations. Exterior Pipe preparation and coating (Overflow flap valve). Replace Compression Ring, if needed. Repair the existing roof plate. Remove & replace Bolts and gasket at Floor Manhole. Install new Confined Space Signag. Relocate Conduit @ water access Hatch, Dry Access Tube Hatch, & Pedestal Ladder. Pressure washing Tank Pedestal. Install Sidewalk. Remove and Install chain link fabric fence with posts. Remove / Clean vegetation along site interior fencing along the tank fence. Remove / Clean vegetation for the 15' perimeter @ ROW fencing. Remove Tree (2" - 16"). Tree Trimming by Arborist (16" and larger). Installation 8" PVC waterline. Connect prop 8" waterline to existing waterline. Remove exist 2" blow-off valve and install 16" x6" Tapping S & V Assembly and Fire Hydrant Assembly per City of Keller Standards. Electrical work including maintaining the operation of all equipment for the duration of the project, including installing electrical components (wire, conduit, and duct bank): Instrumentation work including maintaining the SCADA operation for the duration of the project: Install generator set and ATS, including concrete slab & sidewalk. Hydro-mulch seeding (disturbed area). Preconstruction video of site. Prepare, install, and remove SWPPP. Disinfection and Bac-T sampling of the tank.
Update #1 ·
The proposed Scope of Services (Scope) is intended to encompass professional planning, advising, consulting, and continuity of operation activities which may fit in the broadly defined scope as described below. These may include, but not be limited to, such functions as: studying, monitoring, reporting, documenting, managing, analyzing, assessing, designing, and other related work. Homeland Security, Disaster, Preparedness, and Emergency Response and Recovery: to include areas such as emergency operations, planning and response, contingency, risk assessment, vulnerability, hazards and operability, hazard mitigation, incident response, testing, training and exercise programs, asset management, logistics and support, regional response, decontamination, continuity of operations planning, data management, documentation, debris clean-up, and removal monitoring.
Files
| File | Type | Posted |
|---|---|---|
| R26-010.All Hazards Preparedness.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity