Fort Bend County, Texas is requesting bids on construction of Abbey Lakes Regional Lift Station, with proposals due September 10, 2026.
The scope encompasses a complete lift station including a twelve-foot-diameter cast-in-place concrete wet well with 100% solids epoxy coating; two submersible pumps with accessories; ten-inch ductile iron riser piping and twelve-inch ductile iron header piping with valves and coatings; odor control piping; twelve-inch force main; eighteen-inch and twenty-four-inch on-site sanitary sewer piping and manholes; site work, concrete pavement, and fencing; water line; standby generator and foundation; automatic transfer switch; lift station control panel and foundation; automatic telephone dialer; electrical service disconnect switches; conduit and wire; and all construction work as detailed in the project drawings and specifications. The work includes well pointing and dewatering as necessary to deliver a fully functioning facility.
The contractor must supply all labor, materials, equipment, supervision, and plant required for construction.
Opportunity text
The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct Abbey Lakes Regional Lift Station including but not limited to the construction of the proposed twelve-foot (12') diameter cast-in-place concrete wet well including 100% solids epoxy coating, complete with two (2) submersible pumps with all accessories, ten-inch (10") diameter ductile iron riser piping and 12-inch (12") diameter ductile iron header piping with associated valves and coatings, odor control piping; fence and gates, site work, concrete pavement, 18-inch (18") and 24-inch (24") diameter on-site sanitary sewer piping and manholes including well pointing and dewatering as necessary, 12-inch (12") diameter on-site sanitary sewer force main, water line, standby generator and foundation, automatic transfer switch, lift station control panel and foundation, automatic telephone dialer, electrical service disconnect switches, conduit, wire, construction of electrical service and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.
Files
| File | Type | Posted |
|---|---|---|
| CONTRACT DOCS _ SPECS - Abbey Lakes Regional LS.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity