Palm Beach County Engineering and Public Works Department is soliciting sealed bids for site preparation, landscape installation, and irrigation system construction on the A1A roadway project (US 1 to Donald Ross Road, Project No. 2019805), with bids due August 18, 2026. The procurement carries a mandatory 17 percent Small Business Enterprise (SBE) subcontracting participation goal under the county's Small Business Development Program, with waivers available upon documented good faith efforts.

The scope encompasses site grading to final elevation, installation of landscape trees and plants, sod placement, and complete irrigation system construction including mains, laterals, sprinkler heads, valves, control systems, controllers, wiring, and all related accessories such as backflow preventers and pump stations. The contractor must obtain permits, arrange required inspections per local ordinance, provide guarantee and replacement services, perform cleanup and maintenance, and maintain traffic control throughout installation and future maintenance operations. Minor field adjustments to irrigation layout are anticipated; major relocations require prior departmental approval.

Contract documents are available through the county's Vendor Self Service portal or in hard copy for a non-refundable $50 fee. All bids must include OSBD Schedules 1 and 2, proposal pages, local preference certification, scrutinized companies form, bid bond or bond waiver affidavit, certificate of resolution, active Florida business license, sublet work certification, and either FDOT pre-qualification or qualifications and experience documentation. Bidders between $50,000 and $200,000 may participate in the Bond Waiver Program if an Intent to Participate affidavit is submitted. Contractor and all subcontractors must register in Vendor Self Service prior to award. A non-mandatory pre-bid meeting is scheduled for July 30, 2026, at 2:00 p.m. at the Engineering and Public Works Department in West Palm Beach, with Webex access available. Requests for Information are due at least five working days before bid opening. The contract includes an Apprentice Incentive (20 percent reimbursement of apprentice wages up to $100,000, or $200,000 for projects $20 million or greater) and a Glades Resident Incentive (30 percent reimbursement of new employee wages up to $100,000). E-Verify, Florida Prompt Payment Act compliance, and SBD program monitoring are required throughout performance.

Opportunity text

Provide all labor, materials, equipment and incidentals required to prepare site to final grade, install landscape trees, plants, sod, and irrigation systems in accordance with the plans and as specified. These specifications are inclusive of a required guarantee, replacements, clean-up, maintenance services, and maintenance of traffic, all of which shall be included in the unit bid price for each tree. Irrigation systems shall be constructed using sprinklers, valves, piping, fittings, controllers, wiring, etc. of sizes and types as shown on the drawings and as called for in these specifications. The system shall be constructed to grades and conform to areas and locations as shown on the drawings. Sprinkler lines, valves, piping, wiring, etc. are essentially diagrammatic. Minor adjustments in location to suit field conditions are anticipated. Major relocations shall have prior approval of the Department. Unless otherwise specified or indicated on the drawings, construction of the irrigation system shall include furnishing, installing and testing of all mains, laterals and fittings, furnishing and installing of sprinkler heads, gate valves, control valves, controllers, and control wires, etc.; all necessary specialties and accessories such as backflow preventers, pump stations, excavation and backfill, and all other Work in accordance with the plans and specifications as required for a complete system. B. The Contractor shall obtain all permits and pay required fees to any governmental agency having jurisdiction over the Work. Inspections required by local ordinances shall be arranged as required. Upon completion of the Work, satisfactory evidence that all Work has been installed in accordance with the ordinances and code requirements shall be furnished to the Department. C. While working on medians or on the roadside, proper traffic control shall be used to protect workers and the public. Traffic control operations for installation and for future maintenance shall be in accordance with the Palm Beach County Streetscape Standards Manual, dated October 29, 2003, and as stated in the Maintenance of Traffic Section in these Contract Documents. All Work shall be done in accordance with all local and state codes and standards. All above ground apparatus and structures that are installed shall be kept a minimum of 6' from the adjacent travel lane.

Files

File Type Posted
palm beach 2019805 Spec Book (2).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity