72ND, 73RD, 74TH, 75TH, and Texas Street Sidewalk Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- WBS N-T23000-0005-7
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Benjamin Guo bguo@hrgreen.com (346) 439-9668
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Harris County is requesting bids on sidewalk and ADA ramp reconstruction on 72nd, 73rd, 74th, 75th, and Texas Streets, with proposals due September 30, 2026.
The scope includes reconstructing 6-foot-wide sidewalks to current standards, ADA-compliant wheelchair ramps, concrete leveling, and tree protection. Where sidewalks meet tree roots or select ditches, the contractor must either match existing sidewalk widths or install slip-resistant galvanized steel plates over roots. Work includes a sidewalk railroad crossing on 72nd Street with tracks owned by Union Pacific Railroad. The project also encompasses minor striping, coarse sand under sod, water meter adjustments, and subordinate utility work.
No estimated contract value, contract term, set-aside or preference program, evaluation criteria, pre-bid meeting date, or questions deadline is stated in the source.
Opportunity text
The project involves reconstructing 6-ft (typical) sidewalks and ADA-compliant wheelchair ramps, concrete leveling, and tree protection, which comprises of matching existing sidewalk widths at trees or installing a slip-resistant galvanized steel plate over the roots and select ditches. There is a sidewalk railroad crossing at 72nd street with tracks owned by UPRR. There is also some minor striping works, coarse sand under sod, adjusting water meters, and other minor utility work.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity