6th Floor Dry Eye Suite
Open State & local contract opportunity Posted
- Solicitation number
- 2139241
- State
- New York
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Ying Ting Wan Leeshue yleeshue@sunyopt.edu (212) 938-5945
Updated .
About this opportunity
SUNY College of Optometry is requesting sealed bids for a minor renovation project, 6th Floor Dry Eye Suite (Project No. 010926S), with bids due October 15, 2026 at 11 a.m. EST at 33 West 42nd Street, New York, and a mandatory walk-through on October 2, 2026 at 11 a.m.
The scope includes demolition and renovation of existing Rooms 614 and 615 on the 6th floor to create a new Dry Eye Suite containing one waiting room and three examination rooms. Work encompasses removal of the partition wall between the two rooms, existing flooring, ceiling tiles and suspension system, light fixtures, diffusers, return air grilles, doors, portions of the south wall for new opening, plumbing fixtures and piping, countertop, sink, electrical devices and wiring, and any associated demolition required for the new layout. Construction deliverables include new insulated metal stud and gypsum board partitions from floor slab to deck for the new layout, new doors and openings with an add-on alternate for a storefront door system, new cabinetry and countertops, new suspended acoustical ceiling system, new light switches and fixtures, new power receptacles, and new piping modifications. Bid documents are available upon request via email to yleeshue@sunyopt.edu.
Proposals will be publicly opened and read aloud virtually on October 15, 2026 at 11:30 a.m. EST. This procurement is subject to New York State Finance Law §139-j and §139-k restrictions on communications between the University and potential bidders; failure to comply may result in disqualification under the NYS Procurement Lobbying Act. The designated procurement contact is Ying Ting Wan Leeshue, Director of Procurement, Payment & Business Compliance, at (212) 938-5945 or yleeshue@sunyopt.edu.
Opportunity text
The SUNY College of Optometry will receive sealed bids for project no. 010926S titled 6th Floor Dry Eye Suite until 11a.m. EST on Oct 15, 2026 (Thu) at 33 W42 St., NY NY 10036, where such proposals will be publicly opened and read aloud virtually the same day at 11:30 a.m. EST. Mandatory walk-through is scheduled on October 2, 2026 (Fri) at 11a.m. Request for bid documents can be sent via email to yleeshue@sunyopt.edu. Pursuant to State Finance Law §139-j and §139-k, this solicitation includes and imposes certain restrictions on communications between the University and potential bidders during the procurement process. Failure to adhere to this provision may result in the disqualification under the NYS Procurement Lobbying Act. The designated contacts for this procurement are: Ying Ting Wan Leeshue (Ting), Director of Procurement, Payment & Business Compliance. Tel: (212) 938-5945 ; Email: yleeshue@sunyopt.edu This minor renovation project is renovating the existing 6th Floor - Room 614 and Room 615 - to create a new Dry Eye Suite which includes one (1) waiting room and three (3) examination rooms. The scope of work includes, but is not limited to the following: Demolition of the existing partition wall between Room 614 and Room 615, flooring, ceiling tiles, ceiling suspension system, existing light fixtures, diffusers, return air grilles, two existing doors and portions of the south wall required for new opening, plumbing fixtures and associated piping, countertop, sink, electrical devices, wiring and associated equipment, and any necessary demolition to accommodate the new layout. Construction of new insulated metal stud and gypsum board partitions from floor slab to underside or deck to create the new layout. New doors and opening needed with add-on alternate of storefront door system. New cabinetry and countertops needed. New suspended acoustical ceiling system needed. New light switches and light fixtures needed. New power receptacles needed. New piping modifications needed with installation of sink and faucet. New ductwork modifications needed with installation of four (4) new supply air diffusers and four (4) returned air grilles. One set per each new office. Self-leveling compound or flash patch and new VCT tiles needed. Patch and paint needed. Re-modify and relocate support of the existing radiator plus patch and paint needed. A licensed electrician is required for all electrical work. A licensed plumber is required for all plumbing work A license asbestos contractor is required if any asbestos abatement is involved. Bids must be submitted in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The State University of New York reserves the right to reject any or all bids. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: Base Concept, Sundeep Construction, Al Rasheed Group of Construction Inc., Banu Construction Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 11.00% WBE Goal: 19.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity