365-27 Culvert Liner Pipe Installation

Open State & local contract opportunity Posted

Solicitation number
SRC0000042295
State
Ohio
Responses due

Opportunity facts

Opportunity details come from ohiobuys.ohio.gov. Updated .

About this opportunity

The Ohio Department of Transportation and Infrastructure is soliciting bids on culvert liner pipe installation at Bridge Number GUE-I77-14.87 (SFN 3003302) under ITB 365-27, with bids due October 21, 2026.

The scope requires full installation of an owner-supplied 142" I.D. / 144" O.D. ODOT C & MS 707.18 Smooth-Cor conduit liner inside the existing structure per Standard Specification SS837. The bidder must review the existing project site prior to proposal submission to assess which temporary works—including a 60" side conduit casing running parallel to the structure and positioned north of SFN 3003302—can be reused or modified for this installation. Additional temporary flow capacity may be provided through temporary pumping systems aligned beneath the I.R.-77 bridges (SFN 3003272 & 3003248) to the outlet of culvert CFN 1824268 (72" diameter).

All costs to utilize, modify, supplement, resupply, rebuild, and remove temporary works after liner installation are included within the bidder's pricing proposal. The bidder must account for site preparation, removal or modification of temporary rigging and falsework, resupply of any conduit segments and associated hardware, and all labor and equipment necessary to complete installation. Staged conduit segments and hardware are available at the site for inspection before bid submission; any materials requiring replacement due to damage or loss are the bidder's cost responsibility.

The contract is tied to a single project site. Complete bid proposals must be submitted on the provided ITB 365-27 Pricing Sheet; items or quantities not listed are considered incidental to the bidder's pricing.

Opportunity text

This contract includes all described work to be performed at one project site (GUE-I77-14.87). The Bidder will present a complete bid proposal to fully install an owner-supplied liner pipe inside the existing structure at SFN 3003302_Bridge Number GUE-I77-14.87 as per SS837 and all applicable portions of this contract, except as otherwise described below. The Bidder's entire bid will be presented on the provided ITB 365-27 Pricing Sheet. Any necessary items and/or quantities not included in the ITB 365-27 Pricing Sheet will be considered as incidental to the Bidder's pricing proposal. Prior to bid, the Bidder will review the existing construction site at SFN 3003302_Bridge Number GUE-I77-14.87 to determine what portions of the temporary works can be utilized to continue this installation project. The existing 60" side conduit casing running parallel to SFN 3003302 and positioned just north of SFN 3003302 may be utilized for water control during this project. Additional temporary flow capacity may be provided by temporary pumping systems aligned underneath the I.R.-77 bridges (SFN's 3003272 & 3003248) to the outlet area of culvert CFN 1824268 (72" diameter). All costs to utilize, modify, supplement, resupply, rebuild, and subsequently remove temporary works after the proposed liner is installed will be included within the Bidder's pricing proposal. The Bidder will utilize all supplied and staged segments of 142" I.D. / 144" O.D. ODOT C & MS 707.18 Smooth-Cor conduit and all associated hardware necessary to install the liner pipe. This material is staged at the project site for installation with this contract. Prior to bid, the Bidder will review the supplied conduit and all associated hardware at SFN 3003302_Bridge Number GUE-I77-14.87 to determine whether any portions of the supplied material need resupplied to complete this installation project. All costs to prepare the site for installation, remove or modify temporary rigging/falsework, and utilize, resupply, install, etc. the liner conduit will be included within the Bidder's pricing proposal. The requirement contained in Supplemental Specification 837 to submit the installation plan 15 days prior to installation is reduced to 4 days for this project.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity