The state and local contract opportunity posted by Rensselaer County, New York, is a targeted facade renovation project for 3265 Sixth Avenue in Troy, NY. The procurement involves a comprehensive masonry and window restoration initiative with two distinct work categories that require separate bidding. Masonry work includes re-pointing the bottom 2 feet of the entire facade (approximately 30 sq. ft.), re-pointing underneath second-floor sills (approximately 42 sq. ft.), and caulking the south facade vertical joint (approximately 18 linear feet). Window restoration is divided into two sections: Windows A and B, addressing both broken and non-broken glass panes, involving removal of old glazing, frame preparation, painting, and installation of 1/4" laminated safety glass with silicone glazing. The contract requires precise execution of restoration work, with a strict completion deadline of October 31, 2025. Proposals are due by September 16, 2025, at 8:00 AM, with the expectation that contractors can provide detailed, itemized bids for each specific work category. Evaluation will likely focus on technical capability, restoration expertise, and competitive pricing for the specified scope of work. The contract opportunity includes specific sub-contracting goals for minority-owned (10%), women-owned (10%), and service-disabled veteran-owned businesses (10%). There are no service-disabled veteran-owned set-aside designations for the primary contract. No previous business entities have been awarded identical or substantially similar procurement contracts within the past five years. The procurement is open to qualified contractors with demonstrated experience in historic building restoration, masonry work, and window renovation. While specific budget ranges are not explicitly stated in the provided documentation, the detailed scope suggests a targeted, precise restoration project with clear technical requirements. Contractors will need to demonstrate technical proficiency, understanding of preservation techniques, and ability to meet the strict timeline of completing all work by October 31, 2025. The project is specifically located in Rensselaer County, with a focus on maintaining the architectural integrity of the building at 3265 Sixth Avenue.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
3265 Sixth Avenue Scope Breakdown Revised 8-19-2025.docx | 16KB | Document | 8/25/25 |