2026 Sewer System Rehabilitation – Hillcrest Interceptor CIPP Lining Repair

Closed State & local contract opportunity Posted

Solicitation number
2138869
State
New York
Responses due

Opportunity facts

Jurisdiction
Point of contact

Updated .

About this opportunity

Rockland County is requesting bids on sewer system rehabilitation for the Hillcrest Interceptor under a CIPP lining repair project, with proposals due October 5, 2026.

The scope encompasses cleaning and television inspection of eight sections of the existing Hillcrest Interceptor sewer line with digital audio-visual recording; removal and disposal of debris, sediment, silts, refuse, timber, roots, and materials via conventional non-excavation equipment; removal of protruding service connections; hot tapping and line-stop work on the Pomona Pump Station force main to establish flow bypass piping and/or bypass pumps for upstream sewage diversion; reconstruction of eight sewer sections using Glass Reinforced Plastic, UV Cured-in-Place Pipe (GRP-UV CIPP) lining method; re-opening of all existing active service connections and those inactive connections as ordered by the Engineer; and a final television inspection and digital audio-visual recording of the newly lined interceptor including restored service connections.

No business enterprise has been awarded an identical or substantially similar procurement contract within the past five years, indicating no named incumbent and an open competitive field.

Opportunity text

Clean, television inspect and digital audio-visual record eight (8) sections of the existing Hillcrest Interceptor sewer line and make all investigations of the existing Hillcrest Interceptor pipe requiring reconstruction. Remove and dispose of all debris, sediment, silts, refuse, timber, roots, and materials of all kinds which can be removed by conventional non-excavation type piping cleaning equipment located in the existing Hillcrest Interceptor sewer lines and manholes. Protruding service connections shall be removed. Provide hot tapping, line stop, etc. on Pomona Pump Station force main pipe for flow bypass piping and/or bypass pumps necessary for the diversion of existing sewers upstream of the pipe to be lined. Reconstruct eight (8) sections of the existing Hillcrest Interceptor sewer lines with Glass Reinforced Plastic, UV Cured-in-Place Pipe (GRP-UV CIPP) Lining method. Re-open all existing active service connections and those inactive connections ordered by the Engineer, and perform a final television inspection and digital audio-visual recording of the newly lined interceptor sewer including the restored service connections. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: NONE