2026 Pipe Lining Project

Closed State & local contract opportunity Posted

Solicitation number
2026 Quote 61
State
Washington
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from cityofvancouver.bonfirehub.com. Updated .

About this opportunity

The City of Vancouver, Washington is requesting bids on a pipe-lining project to rehabilitate approximately 187 lineal feet of 8-inch and 524 lineal feet of 15-inch storm sewer using Cured-In-Place Pipe (CIPP), with bids due September 15, 2026 and physical completion required by November 13, 2026.

The scope includes furnishing and installing steam-cured or UV-cured CIPP for fully deteriorated gravity-flow conditions, with all labor, equipment, materials, and incidentals. Work encompasses bypass pumping, cleaning, root and sediment removal, protruding tap removal, initial and final Closed-Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, and final testing in accordance with attached Plans, Provisions, and Standard Specifications. CCTV footage of the existing piping is available at the City's file-transfer portal.

The engineer's estimate is $270,705. The contract is subject to attached Plans, Provisions, and Standard Specifications; no set-aside, preference program, or additional eligibility restrictions are stated in the source.

Opportunity text

Work shall consist of furnishing and installing approximately 187 lineal feet of 8-inch, and 524 lineal feet of 15-inch Cured-In-Place Pipe (CIPP) to rehabilitate existing storm sewer. The CIPP is to be designed for fully deteriorated gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with either steam cured or ultraviolet (UV) cured CIPP. This work shall also include bypass pumping, cleaning, root and sediment removal, protruding tap removal, initial Closed-Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection, and other work, all in accordance with attached Plans, Provisions, and the Standard Specifications. CCTV Footage of the City's piping can be located at the following link: https://filetransfer.cityofvancouver.us/app?operation=pubopp&id=1786129104699X18100798210000iqK7h The Contract Work shall be Physically Complete by November 13, 2026. Engineer's Estimate - $270,705