USMMA - Generator replacement for Barry & Jones Hall
Past New Requirement Updated
- Agency
-
Department of Transportation
- Solicitation expected
- Estimated value
- $250,000 to $499,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- Acquisition strategy
- Open Market
- NAICS code
- 335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing
- Place of performance
- Kings Point, NY
- Forecast number
- 50995
- Points of contact
-
- Matthew Quinn quinm@usmma.edu
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of Transportation is procuring replacement of the existing emergency generator system at the United States Merchant Marine Academy (USMMA) in Kings Point, New York, with solicitation release estimated for September 15, 2026 and award by September 30, 2026. The work includes removal and disposal of the current Cummins 600 kW diesel generator set and Onan OTPC 800-amp automatic transfer switch, installation of a new 600 kW diesel standby generator and 800-amp ATS, and associated electrical, fuel, exhaust, grounding, and control connections, plus system testing and commissioning. The requirement must comply with applicable codes, standards, and historic property requirements given the historic campus location.
The award value is estimated between $250,000 and $499,000 under a firm fixed-price purchase order set aside for total small business. Performance is scheduled from September 30, 2026 through March 31, 2027 at the USMMA campus in Kings Point, New York. Contact Matthew Quinn at the United States Merchant Marine Academy (quinm@usmma.edu) for additional information; funding is through the Maritime Administration's New York office at Kings Point.
Forecast text
Replace the existing emergency generator system and automatic transfer switch (ATS) at USMMA. The existing system consists of a Cummins 600 kW diesel generator set and an Onan OTPC 800-amp ATS. The requirement includes removal and disposal of the existing equipment; installation of a new 600 kW diesel standby generator and 800-amp ATS; associated electrical, fuel, exhaust, grounding, and control connections; and system testing and commissioning. Work will be performed on the historic USMMA campus and must comply with applicable codes, standards, and historic property requirements.