USCGC HEALY (WAGB-20) Service Life Extension Program Integrated Power Plant system upgrades

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $1,000,000
Set-aside
Total Small Business

Forecast facts

Anticipated award
Through
NAICS code
334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
Place of performance
Seattle, WA
Forecast number
F2026074861
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard is procuring integration and recapitalization services for the USCGC HEALY (WAGB-20) Integrated Power Plant system under its Service Life Extension Program, with solicitation release targeted for March 1, 2027 and award anticipated for June 1, 2027. The scope covers integrating recapitalized sub-systems, including the Science Sea Water System Pump and Cyclone Separator, Steering Control System Components, Sanitary System Components, Over-the-Side Weight Handling System, Deaerating Feedwater Tanks, and Bow Thruster, into the existing proprietary Integrated Power Plant system. It also requires on-site technical support for training, system testing, commissioning, and certification, plus maintenance parts lists and a recommended onboard repair parts list; the acquisition is set aside as Total Small Business, but the Coast Guard intends a sole-source award to the Original Equipment Manufacturer.

The estimated award value ranges from $500,000 to $1,000,000 under a Firm Fixed Price purchase order (FAR Subpart 13.5), with performance from June 1, 2027 through May 30, 2029 in Seattle, Washington. The Coast Guard plans these sub-system recapitalizations from FY2027 through FY2031. Jack Phillips, Integrated Production Team Lead, is the primary point of contact at jack.e.phillips@uscg.mil or (206) 827-1603, and John Whittemore, Technical Questions Point of Contact, can be reached at john.h.whittemore2@uscg.mil or (571) 607-7052.

Forecast text

The Coast Guard is planning to conduct specific sub-system recapitalizations in support of the CGC HEALY Service Life Extension Program (SLEP) from FY2027 to FY 2031. A number of these system recapitalizations require integration and tie-in to the existing Integrated Power Plant (IPP) system. The existing IPP system is comprised of the Central Power Plant (common bus electric propulsion and auxiliary power generation systems) and selected components/systems in the auxiliary machinery plant, which is maintained/managed by a separate services contract.

This acquisition is a multi-year contract with the scope focusing on the integration of the recapitalized sub-systems into the IPP system. The sub-systems intended to be recapitalized currently include: the Science Sea Water System Pump and Cyclone Separator, Steering Control System Components, Sanitary System Components, Over-the-Side Weight Handling System, Deaerating Feedwater Tanks, and the Bow Thruster. The IPP system is proprietary and the USCG intends to award to a sole source for this acquisition to the Original Equipment Manufacturer. The Vendor shall provide on-site technical support for training, system testing, commissioning, and certification. The Vendor shall provide maintenance parts lists and a recommended onboard repair parts (OBRP) list for all components.