TTC Facilities Repair and Rehabilitation

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$250,000 to $499,000
Set-aside
Total Small Business

Forecast facts

Anticipated award
Through
NAICS code
237130 Power and Communication Line and Related Structures Construction
Forecast number
47167
Points of contact

Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.

About this forecast

The Department of Transportation is forecasting a new requirement for repair and rehabilitation services at the Transportation Technology Center (TTC) facilities. Main Electric will be responsible for repairing, replacing, and re-manufacturing electrical components and systems in the TTC main substation to ensure safe and reliable power system control, incorporating automated monitoring and fault detection capabilities. Additional scope includes reconfiguring load systems within switchgear, servicing the on-site backup generator system, rearranging pump house electrical supply, and providing comprehensive technical documentation. The solicitation is estimated to release on June 15, 2026, with an estimated award date of August 3, 2026.

This total small business set-aside contract is valued between $250,000 and $499,000 and falls under NAICS code 237130 (Power and Communication Line and Related Structures Construction). The period of performance extends for two years, from August 3, 2026, through August 2, 2028, with work performed at the Transportation Technology Center facilities. Interested parties should direct inquiries to Jennifer Wilsnack at the Department of Transportation via jennifer.wilsnack@dot.gov.

Forecast text

FRA requires Main Electric to perform the following: (1) Repair/replace/re-manufacture, as necessary, electrical components and systems located in and adjacent to the Transportation Technology Center (TTC) main substation (CORE) to achieve safe and reliable power system control; (2) Incorporate such features as required to allow for system control and performance monitoring, including automated monitoring and fault detection; (3) Re-arrangement and re-configuration of load systems within the switchgear to minimize service risks and to permit future replacement of vault power cables while maintaining TTC functionality; (4) Repair/replace/re-configure, as required, components and systems related to the on-site back-up generator system to ensure efficient and effective performance; (5) Re-arrangement of TTC pump house electrical supply to minimize service interruptions; (6) Technical reporting to document the project execution and results, including electrical schematics, system parts lists, operation and maintenance requirements documentation.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast