TN erfo FS CHRKE804 2020-2(6)
Past New Requirement Updated
- Agency
-
Department of Transportation
- Solicitation expected
- Estimated value
- $5,000,000 to $9,900,000
- Set-aside
- HUBZone
Forecast facts
- Anticipated award
- Through
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- TN
- Forecast number
- 40006
- Points of contact
-
- Monique Lynch eflhd.contracts@dot.gov (703) 948-1407
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of Transportation is seeking a HUBZone contractor to repair storm and flood damage on Baker Creek Road within the Cherokee National Forest, Tennessee. The project involves comprehensive road rehabilitation, including grading, resurfacing, drainage culvert replacement and cleaning, roadway realignment, and related miscellaneous work necessitated by significant roadway damages from heavy rain events in February and April 2020. The estimated solicitation release is scheduled for September 1, 2026, with an anticipated contract award by December 1, 2026.
The forecasted contract is valued between $5,000,000 and $9,900,000, structured as a firm fixed-price definitive contract with a performance period from December 1, 2026, to July 1, 2027. The project will be performed entirely in Tennessee and is specifically designated as a HUBZone set-aside opportunity. Potential contractors can direct questions to Emily McCleary at eflhd.contracts@dot.gov or +1 (703) 948-1407, with the contract's source listing ID being FHWA_2026_160.
Forecast text
During the February and April of 2020, a series of heavy rain events caused significant roadway damages within the Cherokee National Forest. The damaged roadways prevent roadway public access into various points of the Cherokee National Forest. Damages include large landslides, roadway and shoulder washouts, clogged or damaged culverts, and other miscellaneous work. Project TN ERFO FS CHRKE804 2020-2(6) will Repair storm and flood damage on Baker Creek Road (FS 55). This project consists of grading, roadway resurfacing, drain dip construction, replacement of drainage culverts, drainage culvert cleaning, ditch reconditioning, roadway realignment, and other miscellaneous work.