SDC CHU Building 1 Sally Port

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$1,000,000 to $2,000,000
Set-aside
Competitive 8(a)

Forecast facts

Anticipated award
Through
NAICS code
238190 Other Foundation, Structure, and Building Exterior Contractors
Place of performance
San Diego, DC
Forecast number
F2026073007
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The Department of Homeland Security Customs and Border Protection is soliciting construction services for a comprehensive upgrade to the Sally Port facility at the Chula Vista Border Patrol processing center in San Diego, California. The project encompasses structural and exterior improvements including replacement of deteriorated chain-link fencing, canopy construction to cover south and west processing areas, concrete wall and floor repairs with repainting, installation of LED lighting fixtures, addition of wall and ceiling electric heaters, construction of an enclosed personal property containment area, expansion of the bus and vehicle Sally Port, and upgrades to the emergency generator system. The solicitation is scheduled for release on February 16, 2026, with an anticipated award date of March 26, 2026.

This contract is set aside as a Competitive 8(a) award with an estimated value between $1,000,000 and $2,000,000 and is classified under NAICS 238190 (Other Foundation, Structure, and Building Exterior Contractors). The project is structured as a Firm Fixed Price definitive contract with an estimated period of performance running from March 26, 2026 through July 24, 2026. All work will be performed in San Diego, California, and inquiries regarding this opportunity should be directed to Rolando Gonzales at the Customs and Border Protection Department at rolando.gonzales@cbp.dhs.gov or (619) 690-7797.

Forecast text

The Chula Vista Border Patrol processing center staging sally port is overdue for upgrade to the sally port holding enclosed fence and out of date enclosed vehicle sally port encloser. The current outside staging is in a state of collapsing in the enclosed fencing and canopy cover. The current roof canopy only covers a small portion of the southeast portion of processing center. A new entire canopy will need to be designed to cover All south and west portion of the processing center from exterior weather conditions. Current ceiling chain link fence and surrounding fence have outlived their usage is need of replacement or repaired, including doors gates. Current exterior walls need repairs and repaint to all surfaces which include concrete processing walls west and south, concrete floors, and CMU walls. The staging lighting fixtures within the enclosed fence need replacement with upgraded LED 4’ light fixtures that will surround entire west and south of canopy. In addition, under canopy wall/ceiling electric heaters will need to be installed due to exterior cold weather. An enclosed staging personal property containment for detainees will need to be installed and enclosed Bus and Vehicle Sally Port. The current staging Sally Port is too small for large buses to enter to unload or transport detainees. Lastly, the current emergency generator will need to be upgraded due to lack of power to support the entire building and relocate to different locations within the new enclosed property fencing. Fence of required to have privacy fence slat throughout south and west sally port.

Acquisition Strategy: 8a Direct Award

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast