Replace HVAC Systems at Goff Hall
Past New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $2,000,000 to $5,000,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Through
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Cape May, NJ
- Forecast number
- F2026073699
- Points of contact
-
- Paul Farnan paul.c.farnan@uscg.mil (609) 898-6316
- Jeffrey L. Schafer jeffrey.l.schafer@uscg.mil (609) 898-6383
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The Department of Homeland Security US Coast Guard is procuring complete replacement of HVAC systems at Goff Hall in Cape May, New Jersey through the Design/Build Construction Services II (Regional) (RMACC II) contract vehicle on a Firm Fixed Price basis. The base bid covers removal and installation of three air handlers, a fluid-cooled condenser, VAV/CAV boxes, exhaust fans, boilers, and heating units, with four optional work packages addressing additional air handlers, make-up air units, boiler installations, and miscellaneous heating equipment. The solicitation released on May 22, 2026, with an anticipated award date of August 3, 2026.
The estimated contract award value ranges from $2,000,000 to $5,000,000, with performance scheduled through February 1, 2027, at Cape May, New Jersey. For requirements and technical questions, contact Jeffrey L. Schafer at jeffrey.l.schafer@uscg.mil or (609) 898-6383; for architectural matters, contact Paul Farnan at paul.c.farnan@uscg.mil or (609) 898-6316.
Forecast text
Complete replacement of various HVAC system(s) components at Goff Hall; including but not limited to:
BASE BID - Remove three (3) existing air handlers and existing air cooled condenser. Provide and install three (3) new air handlers in the mechanical mezzanine and a new fluid cooled condenser, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances;
OPTION 1 - Remove one (1) air handler. Provide and install one (1) new air handler in the mechanical mezzanine and two (2) make up air units with electric duct heater for MAU-1, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances;
OPTION 2 - Remove fifteen (15) existing VAV/CAV boxes and seven (7) existing exhaust fans. Provide and install new VAV/CAV boxes fifteen (15) total located throughout the building. Provide and install new exhaust fans; seven (7) total, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances;
OPTION 3 - Remove two (2) existing boilers. Provide and install two (2) new boilers, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances;
OPTION 4 - Remove one (1) existing electric water heater, two (2) existing cabinet unit heaters, one (1) electric duct heater, and seven (7) existing unit heaters. Provide and install New Electric Water Heater, two (2) Cabinet Unit Heaters, one (1) electric duct heater, and seven (7) unit heaters, with all connections to new equipment, including duct, electrical, fire safety, piping and any/all appurtenances.