Repair Building 111 (C)
Past New Requirement Updated
- Agency
-
Navy NAVFAC Mid Atlantic
Naval Facilities Engineering Command, Department of Defense
- Solicitation expected
- Estimated value
- $2,000,000 to $7,500,000
- Set-aside
- Competitive 8(a)
Forecast facts
- Anticipated award
- Through
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Parris Island, SC
- Forecast number
- N40085-26-RFPREQ-ML-PARIS-IS FEAD-0009
Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.
About this forecast
The Department of the Navy Naval Facilities Engineering Command Mid Atlantic is procuring repair and renovation work for Building 111 at Parris Island, Port Royal, South Carolina under a competitive 8(a) contract. The work includes roofing replacement of existing slate shingled and low-sloped modified bitumen membrane roofed areas with all associated flashing elements, gutters, downspouts, and collector heads; elevator cab and component replacement; sprinkler system installation throughout the building; partial window replacement; installation of an exterior egress stair from the existing second floor exhibit area; and various interior finish upgrades to a portion of the second floor offices including flooring, painting, and minor reconfiguration of walls and doors. The solicitation is estimated to release on April 1, 2026, with an award expected by July 1, 2026.
The estimated award value ranges from $2 million to $7.5 million, with a period of performance of 17 months. Work will be performed on-site at Parris Island, Port Royal, South Carolina. The contract will be issued as a fixed-price delivery order or task order under a competitive multiple award IDIQ vehicle, and no classified or personnel clearances are required.
Forecast text
The work includes roofing replacement of existing slate shingled areas and existing low sloped modified bitumen membrane roofed areas and all associated flashing elements, gutters, downspouts, collector heads, etc., elevator cab/component replacement, installation of sprinkler system throughout, partial window replacement, installation of an exterior egress stair from the existing second floor exhibit area, and various interior finish upgrades to a portion of the second floor offices including flooring, painting and minor reconfiguration of walls and doors and incidental related work.