Phon D. Sutton River Access Ramp
Past New Requirement Updated
- Agency
-
Department of Agriculture
- Solicitation expected
- Estimated value
- $500,000 to $999,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- Place of performance
- Mesa, AZ
- Forecast number
- 43060
- Points of contact
-
- Ashley Thompson sm.fs.smallbusiness@usda.gov
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of Agriculture is seeking a contractor to design and build a durable hardened cement concrete kayak access ramp at the Phon D. Sutton River Access site in Mesa, Arizona. This design-build contract requires the contractor to construct a formalized kayak access route from the east parking lot down to the Salt River that reduces bank damage, separates user groups, and enhances recreation safety. The ramp surfacing must extend the full slope length to the water and be adequately anchored and armored along the upstream edge to resist erosion, with an estimated solicitation release date of September 8, 2026, and an estimated award date of June 30, 2026.
The estimated award value for this contract ranges from $500,000 to $999,000, with a basic exercised value of $650,000. This is a full and open competition procurement classified under NAICS 238110 (Poured Concrete Foundation and Structure Contractors), being conducted as a purchase order in the acquisition planning phase. The work will be performed in Mesa, Arizona, and inquiries should be directed to the United States Department of Agriculture Small Business mailbox at sm.fs.smallbusiness@usda.gov.
Forecast text
Design and build contract to provide a durable formalized kayak access route that reduces bank damage separates user groups and enhances recreation safety. The Contractor shall design furnish and construct a hardened cement concrete kayaker access ramp from the east parking lot down to the Salt River. The ramp is a non-accessible route due to steep terrain. Surfacing shall extend the full slope length to the water be adequately anchored and armored along the upstream edge to resist erosion.