NETC Campus Electrical Modernization

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$5,000,000 to $10,000,000
Set-aside
Competitive 8(a)

Forecast facts

Anticipated award
Through
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
Place of performance
Emmitsburg, MD
Forecast number
F2026073958
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The Federal Emergency Management Agency is releasing a competitive 8(a) solicitation on June 30, 2026, for electrical infrastructure modernization at the National Emergency Training Center (NETC) campus in Emmitsburg, Maryland, with award anticipated September 1, 2026. The contractor will provide all labor, materials, engineering, demolition, installation, testing, commissioning, and documentation necessary to modernize and replace the aging 12.47 kilovolt campus electrical distribution system, including medium-voltage feeders, sectionalizing switchgear, transformers, underground distribution systems, and secondary electrical distribution infrastructure on a firm fixed-price basis, aimed at improving reliability, electrical safety, system redundancy, and long-term operational resiliency.

The estimated award value ranges from $5 million to $10 million, with performance running from September 1, 2026, through February 29, 2028, at the NETC campus in Emmitsburg, Maryland. Mark Mellott, Contracting Officer's Representative, serves as the primary point of contact at (202) 718-8059 or mark.mellott@fema.dhs.gov; Mary Klock, Small Business Coordinator, can be reached at (202) 445-7922 or fema-sb@fema.dhs.gov.

Forecast text

The contractor shall provide all labor, supervision, materials, tools, equipment, engineering, demolition, installation, testing, commissioning, startup, and documentation necessary to modernize and replace the aging electrical infrastructure at the National Emergency Training Center (NETC) in Emmitsburg, Maryland. The contractor shall verify all field conditions prior to construction. Existing drawings indicate an aging 12.47kV campus distribution system consisting of medium-voltage feeders, sectionalizing switchgear, transformers, underground distribution systems, main service equipment, and secondary electrical distribution infrastructure. This project shall modernize the campus electrical system to improve reliability, electrical safety, system redundancy, and long-term operational resiliency.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast