NASOC San Angelo MU2 Hangar Renovation

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$5,000,000 to $10,000,000
Set-aside
Total Small Business

Forecast facts

Anticipated award
Through
NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
San Angelo, DC
Forecast number
F2026073831
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

U.S. Customs and Border Protection is procuring design-build renovation of the approximately 11,000-square-foot NASOC San Angelo MU-2 Hangar on a total small business set-aside, firm fixed-price basis using the Design/Build & Construction Services III (National) contract vehicle. The renovation supports Air and Marine Operations aircraft storage, maintenance, and mission support, requiring design and construction compliance with the Statement of Work and compliance documents while adhering to the aesthetic of the existing hangar structure in terms of materiality, color, building form, and structural expression. Performance extends from September 1, 2026, through December 31, 2028, with solicitation released July 1, 2026, and award anticipated August 15, 2026.

The estimated contract value ranges from $5 million to $10 million. Work is performed entirely in San Angelo, Texas. Michael Haskins (michael.l.haskins@associates.cbp.dhs.gov, 817-471-5467) serves as the requirements contact, with Denise Avery-Craft (denise.k.avery-craft@associates.cbp.dhs.gov, 571-643-8936) as the alternate contact.

Forecast text

The U.S. Customs and Border Protection (CBP), Office of Facilities and Asset Management (OFAM), Operations Support Facilities (OSF), Project Delivery Branch (PBD) has a DB requirement renovation of the NASOC San Angelo MU-2 Hangar to support the Air and Marine Operations (AMO) to store and maintain aircraft, support safe missions, and protect assets. The total gross renovation area is approximately 11,000 square feet. See Compliance Documents (CD) 9.01-1 through 9.01-3 for reference.

The Contractor’s design and build shall comply with the requirements listed in this Statement of Work (SOW) Section 4 in accordance with the CD 9.01 through 9.28 in SOW Section 9.

The design and construction of the facilities generally adhere to the aesthetic of the existing hangar and shall consider factors such as materiality and color, plan configuration, building form and section, expression of structural elements, and use of glazing for views.

Acquisition Strategy: SB