NABR - 15674 - Replace Failing Solar Array Panels - Construction
Forecast New Requirement Updated
- Agency
-
Department of the Interior
- Solicitation expected
- Estimated value
- $500,000 to $999,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Not on record
- NAICS code
- 221114 Solar Electric Power Generation
- Place of performance
- UT
- Forecast number
- 50001
- Points of contact
-
- Lena I Pace lena_pace@nps.gov
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of the Interior is replacing failing solar array panels and associated electrical components at Natural Bridges National Monument in Utah, with estimated solicitation release on January 31, 2027. The project replaces eight 420-volt strings of monocrystalline solar panels installed in 1999 that have reached end of useful service life, along with 900 lineal feet of electrical wiring, 16 each 600-volt DC fuses, and 8 each 600-volt DC arresters, and integrates the system to generators.
The estimated award value ranges from $500,000 to $999,000. Place of performance is Utah. Lena I Pace, Chief of the Office of Public Trust at the National Park Service, serves as the point of contact (lena_pace@nps.gov).
Forecast text
Project replaces panels, inverters, wiring and integrates system to generators. This project replaces eight (8) 420-volt strings of monocrystalline solar panels in the Natural Bridges National Monument photovoltaic array field that were installed in 1999 and is now past their useful service life, including 8 feet X 24 feet at 112 solar panels, 900 lineal feet of electrical wiring from each panel to the array field junction box, 16 each 600-volt DC fuses, and 8 each 600-volt DC arresters.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast