M&r housing mechanical sys at USCG tracen, petaluma
Past New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $10,000,000 to $20,000,000
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Petaluma, CA
- Forecast number
- F2026073310
- Points of contact
-
- Tony van Winden tony.p.vanwinden@uscg.mil (707) 478-1345
- Rick Lavelle richard.j.lavelle@uscg.mil (707) 765-7538
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard is soliciting proposals for the conversion of propane fuel equipment to electrically powered equipment across 140 family housing units totaling 300,000 square feet at Training Center Petaluma. The scope of work includes removal of 280 propane hot water and house heaters, installation of 140 hot water heat pumps, 140 HVAC air handlers, 140 circuit panels, and ten transformers, along with functional testing to ensure adequate heating and cooling in the residences. The solicitation is estimated to release on February 2, 2026, with an anticipated award date of March 17, 2026.
This contract is reserved for Service-Disabled Veteran-Owned Small Businesses and carries an estimated award value between $10 million and $20 million. The project will be performed in Petaluma, California, with an estimated performance period from March 17, 2026, through January 31, 2028. The primary points of contact are Tony van Winden, Technical Director at USCG TRACEN Petaluma (tony.p.vanwinden@uscg.mil, 707-765-7655), and Rick Lavelle, the requirements contact (richard.j.lavelle@uscg.mil, 707-765-7538).
Forecast text
Description of Requirement: The USCG requires conversion of the propane fuel
equipment to electrically powered equipment in the 140 family housing units that total
300,000 square feet at Training Center Petaluma. The work includes removal of
280 propane hot water and house heaters, installation of 140 hot water heat pumps,
140 heating, ventilation and air conditioning air handlers, 140 circuit panels and ten
transformers, and functional testing to ensure adequate heating and cooling in the
residences.