M&R Bldg 205 SSO Locker

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$1,000,000 to $2,000,000
Set-aside
Total Small Business

Forecast facts

Anticipated award
Through
NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
Staten Island, NY
Forecast number
F2026075141
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The Department of Homeland Security US Coast Guard is conducting a Total Small Business set-aside procurement for repair and renovation of Building 205 (SSO Locker) at Sector New York in Staten Island, New York, with solicitation release targeted for October 30, 2026, and award on December 25, 2026. The project scope includes roof replacement, facade replacement, entryway replacement, ventilation system addition, fire alarm replacement, and flooring and sub-floor replacement for the 5,291-square-foot single-story prefabricated modular structure built in 2006, which currently experiences roof leaks, a non-functional fire alarm system, inadequate egress signage, lack of ventilation, peeling exterior panels, and rotting doors and staircases.

The estimated award value ranges from $1 million to $2 million under a Firm Fixed Price Definitive Contract, with performance scheduled from December 25, 2026, through June 25, 2027, at the Staten Island facility. Michael Carosotto, Technical Director (michael.p.carosotto@uscg.mil, 571-608-9991), serves as the requirements contact, and Sean Waldron (sean.e.waldron@uscg.mil, 401-318-3344) is the Small Business set-aside coordinator.

Forecast text

The SSO Locker Building (Bldg. 205) serves as the sole ready gear locker/wet room facility at Sector New York. The building is a single story 5291 SF prefabricated modular structure constructed in 2006 on a concrete block foundation with a flat roof and surrounded by a faux brick skirt. The building contains Male and Female locker rooms, heads, wet rooms and storage spaces. The roof has numerous leaks. The fire alarm system no longer functions (due to water intrusion) and the building lacks emergency egress signs and modern lighting. The building (essentially a large locker room/head) is not ventilated (non-code compliant construction) and contains a continuous strong musty odor. The ½” thick exterior brick facade architectural panels are peeling away from the building. The wooden access staircases and doors are rotting. The vinyl flooring has rips and gashes throughout caused by the flexing of the poorly supported under flooring.

SCOPE:

Summary: This project will replace the roof and façade, replace the entryways, add ventilation, replace the fire alarm and replace the flooring/sub-floor.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast