MORA - 17280 - Rehabilitate Longmire Primary Power Generator Backup System

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$2,000,000 to $4,900,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Not on record
NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
Place of performance
WA
Forecast number
50792
Points of contact

Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.

About this forecast

The Department of the Interior is procuring rehabilitation of the Longmire Primary Power Generator Backup System, including replacement of two 480-volt, 350-kilowatt three-phase generators that are over 35 years old, replacement of a bank of three live-front transformers with a single dead-front unit, and replacement of a manual transfer panel with an automated transfer system to enable automatic switching between commercial and generator power. The estimated solicitation release date is January 31, 2027.

The estimated award value ranges from $2 million to $4.9 million. Work will be performed in Longmire, Washington. Gregory Dudgeon, National Park Superintendent at the National Park Service, serves as the point of contact at greg_dudgeon@nps.gov or (907) 455-0614.

Forecast text

In Longmire, the two 480 volt, 350 kilowatt three phase generators supply emergency power throughout the area when commercial power is disrupted. The generators are currently manually engaged. This project will automate the transfer between commercial and generator power. The generators, which are over 35 years old, will be replaced; the bank of three live-front transformers will be replaced by one dead-front unit, and the manual transfer panel will be replaced by an automated one.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast