Maintenance & Repair to IPD

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $1,000,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
Cape May, NJ
Forecast number
F2026075437
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard is procuring maintenance and repair services to the Interior Permanent Design building at Training Center Cape May, New Jersey, under the Design/Build Construction Services II Regional (RMACC II) contract vehicle, with solicitation targeted for release April 15, 2027, and award anticipated June 11, 2027. The scope includes removal and replacement of low-slope roofing systems with standing seam metal roof and associated aluminum gutters and downspouts, replacement of exterior aluminum-framed windows and doors, interior and exterior building repairs, and removal and replacement of the Main Distribution Panel electrical equipment under a firm fixed-price contract structure.

The estimated award value ranges from $500,000 to $1 million, with performance scheduled from June 11, 2027, through September 19, 2027, at Cape May, New Jersey. Robert Spangler, Contracting Officer at CEU Cleveland, may be contacted at robert.t.spangler@uscg.mil or (571) 610-7286. Paul Farnan, Architect at TRACEN Cape May and requirements point of contact, may be reached at paul.c.farnan@uscg.mil or (609) 898-6316.

Forecast text

The scope of work generally consists of interior and exterior repairs to the building structure/envelope, removal and replacement of low-slope roofing systems, as well as the removal and replacement of select electrical equipment at IPD at Training Center Cape May. Work includes, but is not limited to:

- Removal of existing exterior aluminum-framed window and door assemblies, and the installation of new exterior aluminum-framed window and door assemblies;

- Removal of existing standing seam metal roof, and the installation of new standing seam metal roof, including the removal and replacement of existing aluminum gutters and downspouts;

- Removal and replacement of Main Distribution Panel.